You need a Safe Work Method Statement (SWMS) when the job is high risk construction work (HRCW). For earthmoving, the categories that come up most are powered mobile plant, trenches deeper than 1.5 metres, energised services, traffic corridors and falls over 2 metres. Match each task to the categories. Do not assume plant work is always in, or always out.
This page goes deeper on one trade family. For the general test, see do I need a SWMS? To compare all the packs, see which SWMS pack do I need? For trench collapse, shoring and the rules for excavations deeper than 1.5 metres, see which excavation tasks need a SWMS?
Which categories matter for earthmoving?
The model WHS Regulations list 18 categories of HRCW. The full list is in our high risk construction work guide. The ones earthmoving and civil crews hit most are construction work that:
- is carried out in an area at a workplace in which there is any movement of powered mobile plant
- is carried out in or near a shaft or trench with an excavated depth greater than 1.5 metres, or a tunnel
- is carried out on or near energised electrical installations or services
- is carried out on or near pressurised gas distribution mains or piping, or chemical, fuel or refrigerant lines
- is carried out on, in or adjacent to a road, railway or other traffic corridor in use by traffic other than pedestrians
- involves a risk of a person falling more than 2 metres
- is carried out in or near a confined space, or in or near water with a risk of drowning.
One SWMS can cover several categories, but it has to cover all of the HRCW in the task.
Common jobs and the categories they often trigger
This is a guide, not a ruling. Whether a category applies depends on the site, the depth, what is overhead and underground, and who else is around.
| Task | Often triggers | Note |
|---|---|---|
| Operating an excavator, skid steer, loader, dozer, grader or roller | Powered mobile plant moving in the area | Add trench, services or traffic categories where the job brings them in. |
| Trench, pit or shaft excavation | Shaft or trench deeper than 1.5 m; powered mobile plant; energised services if buried power is nearby | A deep or poorly ventilated pit can also be a confined space. |
| Bulk excavation and cut-to-fill | Powered mobile plant; falls over 2 m at batters and edges | Check for services and any trench work inside the bulk dig. |
| Digging or boring near underground services | Work on or near energised electrical services; pressurised gas mains; chemical or fuel lines | Service location supports the controls; it does not remove the category. |
| Working under or near overhead power lines | Work near energised electrical installations or services; powered mobile plant | Approach distances and spotters come from your regulator and the network operator. |
| Road works and work beside a live road or rail line | Work on or adjacent to a road, railway or other traffic corridor in use | Traffic management sits beside the SWMS. |
| Tipper, water cart, telehandler and truck movements on site | Powered mobile plant moving in the area | Pedestrian exclusion and spotters are the usual controls. |
| Work in or near dams, creeks or flooded excavations | Work in or near water with a risk of drowning | Often combined with mobile plant near unstable edges. |
| Pits, drainage and stormwater structures | Work in or near a confined space; trench deeper than 1.5 m | Entry needs a permit and standby person, not just a SWMS. |
| Breaking out or demolishing structural concrete with plant | Demolition of a load-bearing element; powered mobile plant | Cutting and breaking concrete may also need a silica plan. |
Two things the table does not change. A client or principal contractor can ask for a SWMS for work that is not HRCW, as a contract or site rule. And work that is not HRCW still has to be managed safely, even without a SWMS.
What about silica and confined spaces?
Cutting, breaking or excavating rock and concrete can create silica dust. That can need a silica risk control plan as well as the SWMS. See what is a silica risk control plan? and what are WES and WEL?
Pits, sewers and some deep excavations can be confined spaces. Entering one needs an entry permit, a standby person and a rescue plan, not just a SWMS. See confined space entry and rescue.
Earthmoving or Civil Works pack?
Both are $249.99 per state, editable Word, one-off purchase.
- Earthmoving and Mobile Plant (28 SWMS) is built around operating and maintaining plant: Excavator Operation, Skid Steer (Pozi Track), Bulk Excavation, Chain Trencher, Roller, Scraper, Dozer & Grader, Tipper & Dog, Water Cart, Telehandler, Road Rail Excavator, Bogged Vehicle Recovery, Service Location and Lock Out Tag Out.
- Civil Works (49 SWMS) covers the wider civil job: Trench Excavation (incl. Near Assets), Hydro Excavation, Horizontal Directional Boring, Pit & Drainage Construction, Road Base & Sealing, Roads & Traffic Management, Working Near Rail Corridors, Working Near Overhead Power Lines, Confined Space Work, Silica Dust and Construction Night Works.
If you mainly run machines for others, start with Earthmoving. If you take on trenching near assets, drainage, roads or traffic work, look at Civil Works. Read both task lists against your usual jobs before buying, and do not buy both if one already covers your work.
What still has to be tailored?
A template gives you the tasks, hazards and controls for the trade. Before it goes to site, add:
- the site, the plant you are actually using and the operators’ licences and competencies
- the services information: what is underground and overhead, and how it was located
- the depth and ground conditions, and the benching, battering or shoring you will use
- exclusion zones, spotters and traffic arrangements for this site
- who supervises, and how the controls will be checked.
See how to use a SWMS template, and keeping, signing and reviewing a SWMS for what happens once it is in use.
Victoria and other states
Victoria lists 19 types of HRCW under its own OHS Regulations 2017. They are similar to the model list but worded separately, so use WorkSafe Victoria’s list for work there. Other states and territories have adopted the model list in their own regulations. See SWMS requirements by state.
Common questions
Do I need a SWMS just to operate an excavator?
Construction work in an area where powered mobile plant is moving is high risk construction work under the model WHS Regulations, so most excavator work on a construction site needs a Safe Work Method Statement (SWMS). Trench depth, services, traffic and edges can add more categories.
Does every trench need a SWMS?
The trench category applies to work in or near a shaft or trench deeper than 1.5 metres, or a tunnel. A shallower trench dug with an excavator is usually still covered by the powered mobile plant category. Check every category against the actual job.
Should I buy the Earthmoving or the Civil Works pack?
Earthmoving and Mobile Plant focuses on operating and maintaining plant. Civil Works adds trenching near assets, boring, drainage, roads, traffic, rail corridors, overhead power lines and confined spaces. Compare the task lists against the jobs you actually do.
Is the list different in Victoria?
Victoria uses its own OHS Regulations 2017 and lists 19 types of high risk construction work. The categories are similar but worded separately, so check WorkSafe Victoria’s list for work in Victoria.
Sources: Model WHS Regulations, regulation 291, Model Code of Practice: Construction work and WorkSafe Victoria—SWMS. General information only; whether a category applies depends on the job, so check with your regulator if unsure.
Start from a proper SWMS, not a blank page
State-specific, editable templates written for your state. Download instantly, then make it yours for the job and the site.
This guide is general information, not legal or safety advice, and does not guarantee compliance. Laws and site conditions vary, so always check your state regulator and have documents reviewed by a competent person.