You need a Safe Work Method Statement (SWMS) for excavation work that is high risk construction work (HRCW). For trenching, the category that matters most is work in or near a shaft or trench with an excavated depth greater than 1.5 metres, or a tunnel. Most digging also brings in the powered mobile plant category, and many excavations add a fall risk of more than 2 metres, underground services or a confined space.
The SWMS is only part of the legal picture. The Work Health and Safety (WHS) Regulations also set specific rules for underground services information and for supporting the sides of trenches at least 1.5 metres deep. This guide covers when a SWMS is needed, what it must say about collapse, and the rules that sit beside it.
If your work is mostly operating plant, see which earthmoving and mobile plant tasks need a SWMS?. This guide stays on the excavation itself.
When is excavation work construction work?
Under the model WHS Regulations, construction work includes "any work connected with an excavation" (regulation 289 of the model WHS Regulations; section 289 of Queensland's WHS Regulation 2011). Minor testing, maintenance or repair work on a structure is excluded (r 289(3)(d)), but digging a trench for services, drainage or footings is not minor work of that kind.
Which high risk construction work categories apply?
The model WHS Regulations list 18 categories of high risk construction work in regulation 291 (section 291 in Queensland). The ones excavation work hits most are construction work that:
- is carried out in or near a shaft or trench with an excavated depth greater than 1.5 metres, or a tunnel
- is carried out in an area at a workplace in which there is any movement of powered mobile plant
- involves a risk of a person falling more than 2 metres
- is carried out in or near a confined space
- is carried out on or near pressurised gas distribution mains or piping
- is carried out on or near chemical, fuel or refrigerant lines
- is carried out on or near energised electrical installations or services
- is carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor that is in use by traffic other than pedestrians
- involves, or is likely to involve, the disturbance of asbestos.
Note the wording: the category covers work "in or near" the trench. Workers laying pipe beside a deep trench, or plant operating at its edge, can be inside the category even if nobody goes into the trench.
Common excavation jobs and the categories they often trigger
This is a guide, not a ruling. The depth, the ground, the services and the plant on site decide which categories apply.
| Excavation task | Often triggers | Note |
|---|---|---|
| Service trench deeper than 1.5 m | Trench over 1.5 m; powered mobile plant; falls over 2 m | The support method (shoring, benching or battering) belongs in the SWMS. |
| Shallow trench dug with an excavator | Powered mobile plant | Shallow trenches can still collapse; the duty to manage the risk does not start at 1.5 m. |
| Pits, manholes and shafts | Trench or shaft over 1.5 m; confined space | Some pits are confined spaces with their own entry permit rules. |
| Bulk excavation and basements | Powered mobile plant; falls over 2 m at edges | Batters, edge protection and access for workers below. |
| Digging near gas, fuel or power | Pressurised gas mains; chemical or fuel lines; energised electrical services | Locate services before digging and set how close plant can work. |
| Road openings and kerbside trenches | Traffic corridor; powered mobile plant | A traffic management plan or traffic guidance scheme may also be needed. |
| Breaking out old pits or slabs | Possibly asbestos; powered mobile plant | Older pipes, pits and sheeting can contain asbestos. |
| Hand digging a small hole for a post | Often none | A builder can still ask for a SWMS as a site rule. |
What must an excavation SWMS cover?
Regulation 299 of the model WHS Regulations (section 299 in Queensland) says a SWMS must:
- identify the work that is high risk construction work
- state the hazards relating to that work and the risks to health and safety associated with those hazards
- describe the measures to be implemented to control the risks
- describe how the control measures are to be implemented, monitored and reviewed.
It must take into account the circumstances at the workplace and, on a construction project, the principal contractor's WHS management plan. It must be readily accessible and understandable to the people who use it.
For excavation work, that usually means the SWMS sets out:
- the depth, length and ground conditions of the excavation, and who assessed them
- how the sides will be supported: shoring by shielding or other comparable means, benching or battering, or the geotechnical engineer's written advice that applies
- where spoil, materials and plant will be kept so they do not load the edge
- how water, rain and vibration from nearby plant or traffic are dealt with
- how workers get in and out safely, and how the edge is protected
- how the area is secured from unauthorised access
- the services located, how they were located, and how close plant and hand tools can work to them
- the emergency and rescue arrangements if someone is trapped
- who supervises, and how the controls will be checked as the dig progresses.
Workplace Health and Safety Queensland (WHSQ) says statements such as "use appropriate PPE" (personal protective equipment) do not detail the control measures. Name the support system you will actually use, not a list of options.
The collapse rules beside the SWMS
Managing excavation risks. Regulation 305 of the model WHS Regulations (section 305 in Queensland) requires a person conducting a business or undertaking (PCBU) to manage the risks of excavation work, including a person falling into an excavation, being trapped by its collapse, being struck by a falling thing, and being exposed to an airborne contaminant.
Trenches at least 1.5 metres deep. Regulation 306 (section 306 in Queensland) applies to a trench at least 1.5 metres deep. The PCBU must, so far as is reasonably practicable, secure the work area from unauthorised access, including inadvertent entry. The PCBU must also minimise the risk of collapse by ensuring all sides of the trench are adequately supported by one or more of:
- shoring by shielding or other comparable means
- benching
- battering.
The support rule does not apply if the PCBU receives written advice from a geotechnical engineer that all sides of the trench are safe from collapse. That advice must state the period it applies to, and it may be conditional on natural events such as rain.
Two thresholds are worth keeping straight. The high risk construction work category applies to a trench with an excavated depth greater than 1.5 metres. The trench support rule applies to a trench at least 1.5 metres deep. Plan for both.
Underground services. Regulation 304 (section 304 in Queensland) says the person with management or control of the workplace must take all reasonable steps to obtain current underground essential services information before excavation starts, give it to the people doing the work, and keep it available until the work is completed (or for at least 2 years if a notifiable incident occurs).
Safe Work Australia's model Code of Practice: Excavation work (October 2018) deals with excavation work generally, including trenches, shafts and tunnels. It says: "Excavation collapses are particularly dangerous. They can occur quickly, limiting the ability of workers and others to escape, especially if the collapse of a trench, tunnel or shaft is extensive."
Other things the job may need
Confined spaces. Some pits, shafts and chambers are confined spaces. A worker cannot be directed to enter one without a confined space entry permit (regulation 67 of the model WHS Regulations; section 67 in Queensland). See confined space entry and rescue.
Silica and dust. Excavating or breaking rock and concrete can release respirable crystalline silica. From 1 December 2026, workplace exposure limits (WEL) replace the workplace exposure standards (WES); Safe Work Australia says PCBUs must comply with the WES list up to and including 30 November 2026, and with the WEL list from 1 December 2026. Some jurisdictions have transition arrangements for particular substances, so check your regulator. See what are WES and WEL? and what is a silica risk control plan?.
Traffic. Excavations on or beside a road usually need a traffic plan as well. See what is a traffic management plan?.
What is in the Civil Works pack?
The Civil Works SWMS Trade Pack has 49 SWMS: one Civil Works Master SWMS and 48 task SWMS. The excavation-related ones include:
- Service Location (Non-invasive)
- Bulk Excavation
- Trench Excavation (incl. Near Assets)
- Hydro Excavation (Vacuum - Trailer - Truck)
- Pit & Drainage Construction
- Retaining Walls
- Horizontal Directional Boring
- Guided Boring & Pipe Jacking
- Confined Space Work
- Silica Dust
The pack comes in editable Word with a free pack of 34 safe operating procedures (SOPs). Each state edition references that state's Act and regulator, and the Victorian edition uses the Occupational Health and Safety (OHS) Act 2004 and WorkSafe Victoria. If you mainly operate plant, compare it with the Earthmoving and Mobile Plant pack before buying.
What still has to be tailored?
Before the SWMS goes to site, add:
- the site, the excavation dimensions and the ground conditions found
- the support system, who designed or selected it, and any geotechnical advice and its time limit
- the services information obtained and how services were located on site
- spoil, plant and material placement for this site
- access, egress, edge protection and barriers
- the rescue arrangements and who is trained to carry them out
- who supervises, and the crew's sign-on after you have talked it through with them.
See how to use a SWMS template and keeping, signing and reviewing a SWMS.
Victoria and other states
Victoria uses the Occupational Health and Safety Regulations 2017, made under the Occupational Health and Safety Act 2004. Its list of 19 types of high risk construction work includes construction work "involving a trench or shaft if the excavated depth is more than 1ยท5 metres" and "involving a tunnel" (regulation 322). Two Victorian rules are worth knowing:
- Notice to WorkSafe Victoria. An employer or self-employed person must notify WorkSafe Victoria in writing at least 3 days before starting construction excavation work on a shaft, trench or tunnel (regulation 355). In Victoria, construction excavation means a trench deeper than 1.5 metres, a shaft deeper than 2 metres, or a tunnel. There are exceptions, including a shaft or trench dug as part of building work under a building permit (regulation 354).
- Engulfment emergency procedures. Where there is a risk of a person being engulfed by soil or other material, emergency procedures for rescue and first aid must be in place before the work starts (regulation 331).
The other states and territories have adopted the model WHS Regulations in their own laws, with the same regulation numbers for these rules. See SWMS requirements by state.
Common questions
Does every trench need a SWMS?
The trench category applies to work in or near a shaft or trench with an excavated depth greater than 1.5 metres, or a tunnel. A shallower trench dug with an excavator is usually still high risk construction work because powered mobile plant is moving in the area. Check every category against the actual job.
What does the law say about supporting a trench?
For a trench at least 1.5 metres deep, the model WHS Regulations (regulation 306) require all sides to be adequately supported by shoring, benching or battering, unless a geotechnical engineer gives written advice that all sides are safe from collapse. The work area must also be secured from unauthorised access, so far as is reasonably practicable.
Who has to find the underground services?
The person with management or control of the workplace must take all reasonable steps to obtain current underground essential services information before excavation starts, and give it to the people doing the work (regulation 304). The SWMS should say how services were located on site and how close plant can work to them.
Is a pit or shaft a confined space?
Some are. If it meets the definition of a confined space, a worker cannot be directed to enter it without a confined space entry permit, and the confined space category of high risk construction work also applies. A deep pit or shaft can trigger the trench or shaft category as well.
Do I need to notify the regulator before digging in Victoria?
Usually, for deeper work. Victoria requires written notice to WorkSafe Victoria at least 3 days before construction excavation work on a trench deeper than 1.5 metres, a shaft deeper than 2 metres, or a tunnel, with exceptions such as excavation for building work under a building permit.
Sources: Work Health and Safety Regulation 2011 (Qld), sections 67, 289, 291, 299, 304, 305 and 306, Model WHS Regulations numbering, Occupational Health and Safety Regulations 2017 (Vic), Authorised Version No. 018 (as at 20 October 2026), regulations 5 (construction excavation), 322, 331, 354 and 355, Safe Work Australia, Model Code of Practice, Safe Work Australia, Workplace Exposure Limits for airborne contaminants and Workplace Health and Safety Queensland, Safe work method statements ("use appropriate PPE").
Start from a proper SWMS, not a blank page
State-specific, editable templates written for your state. Download instantly, then make it yours for the job and the site.
This guide is general information, not legal or safety advice, and does not guarantee compliance. Laws and site conditions vary, so always check your state regulator and have documents reviewed by a competent person.