You need a Safe Work Method Statement (SWMS) for excavation work that is high risk construction work (HRCW). For trenching, the category that matters most is work in or near a shaft or trench with an excavated depth greater than 1.5 metres, or a tunnel. Most digging also brings in the powered mobile plant category, and many excavations add a fall risk of more than 2 metres, underground services or a confined space.

The SWMS is only part of the legal picture. The Work Health and Safety (WHS) Regulations also set specific rules for underground services information and for supporting the sides of trenches at least 1.5 metres deep. This guide covers when a SWMS is needed, what it must say about collapse, and the rules that sit beside it.

If your work is mostly operating plant, see which earthmoving and mobile plant tasks need a SWMS?. This guide stays on the excavation itself.

When is excavation work construction work?

Under the model WHS Regulations, construction work includes "any work connected with an excavation" (regulation 289 of the model WHS Regulations; section 289 of Queensland's WHS Regulation 2011). Minor testing, maintenance or repair work on a structure is excluded (r 289(3)(d)), but digging a trench for services, drainage or footings is not minor work of that kind.

Which high risk construction work categories apply?

The model WHS Regulations list 18 categories of high risk construction work in regulation 291 (section 291 in Queensland). The ones excavation work hits most are construction work that:

Note the wording: the category covers work "in or near" the trench. Workers laying pipe beside a deep trench, or plant operating at its edge, can be inside the category even if nobody goes into the trench.

Common excavation jobs and the categories they often trigger

This is a guide, not a ruling. The depth, the ground, the services and the plant on site decide which categories apply.

Common excavation jobs and the categories they often trigger
Excavation taskOften triggersNote
Service trench deeper than 1.5 mTrench over 1.5 m; powered mobile plant; falls over 2 mThe support method (shoring, benching or battering) belongs in the SWMS.
Shallow trench dug with an excavatorPowered mobile plantShallow trenches can still collapse; the duty to manage the risk does not start at 1.5 m.
Pits, manholes and shaftsTrench or shaft over 1.5 m; confined spaceSome pits are confined spaces with their own entry permit rules.
Bulk excavation and basementsPowered mobile plant; falls over 2 m at edgesBatters, edge protection and access for workers below.
Digging near gas, fuel or powerPressurised gas mains; chemical or fuel lines; energised electrical servicesLocate services before digging and set how close plant can work.
Road openings and kerbside trenchesTraffic corridor; powered mobile plantA traffic management plan or traffic guidance scheme may also be needed.
Breaking out old pits or slabsPossibly asbestos; powered mobile plantOlder pipes, pits and sheeting can contain asbestos.
Hand digging a small hole for a postOften noneA builder can still ask for a SWMS as a site rule.

What must an excavation SWMS cover?

Regulation 299 of the model WHS Regulations (section 299 in Queensland) says a SWMS must:

  1. identify the work that is high risk construction work
  2. state the hazards relating to that work and the risks to health and safety associated with those hazards
  3. describe the measures to be implemented to control the risks
  4. describe how the control measures are to be implemented, monitored and reviewed.

It must take into account the circumstances at the workplace and, on a construction project, the principal contractor's WHS management plan. It must be readily accessible and understandable to the people who use it.

For excavation work, that usually means the SWMS sets out:

Workplace Health and Safety Queensland (WHSQ) says statements such as "use appropriate PPE" (personal protective equipment) do not detail the control measures. Name the support system you will actually use, not a list of options.

The collapse rules beside the SWMS

Managing excavation risks. Regulation 305 of the model WHS Regulations (section 305 in Queensland) requires a person conducting a business or undertaking (PCBU) to manage the risks of excavation work, including a person falling into an excavation, being trapped by its collapse, being struck by a falling thing, and being exposed to an airborne contaminant.

Trenches at least 1.5 metres deep. Regulation 306 (section 306 in Queensland) applies to a trench at least 1.5 metres deep. The PCBU must, so far as is reasonably practicable, secure the work area from unauthorised access, including inadvertent entry. The PCBU must also minimise the risk of collapse by ensuring all sides of the trench are adequately supported by one or more of:

The support rule does not apply if the PCBU receives written advice from a geotechnical engineer that all sides of the trench are safe from collapse. That advice must state the period it applies to, and it may be conditional on natural events such as rain.

Two thresholds are worth keeping straight. The high risk construction work category applies to a trench with an excavated depth greater than 1.5 metres. The trench support rule applies to a trench at least 1.5 metres deep. Plan for both.

Underground services. Regulation 304 (section 304 in Queensland) says the person with management or control of the workplace must take all reasonable steps to obtain current underground essential services information before excavation starts, give it to the people doing the work, and keep it available until the work is completed (or for at least 2 years if a notifiable incident occurs).

Safe Work Australia's model Code of Practice: Excavation work (October 2018) deals with excavation work generally, including trenches, shafts and tunnels. It says: "Excavation collapses are particularly dangerous. They can occur quickly, limiting the ability of workers and others to escape, especially if the collapse of a trench, tunnel or shaft is extensive."

Other things the job may need

Confined spaces. Some pits, shafts and chambers are confined spaces. A worker cannot be directed to enter one without a confined space entry permit (regulation 67 of the model WHS Regulations; section 67 in Queensland). See confined space entry and rescue.

Silica and dust. Excavating or breaking rock and concrete can release respirable crystalline silica. From 1 December 2026, workplace exposure limits (WEL) replace the workplace exposure standards (WES); Safe Work Australia says PCBUs must comply with the WES list up to and including 30 November 2026, and with the WEL list from 1 December 2026. Some jurisdictions have transition arrangements for particular substances, so check your regulator. See what are WES and WEL? and what is a silica risk control plan?.

Traffic. Excavations on or beside a road usually need a traffic plan as well. See what is a traffic management plan?.

What is in the Civil Works pack?

The Civil Works SWMS Trade Pack has 49 SWMS: one Civil Works Master SWMS and 48 task SWMS. The excavation-related ones include:

The pack comes in editable Word with a free pack of 34 safe operating procedures (SOPs). Each state edition references that state's Act and regulator, and the Victorian edition uses the Occupational Health and Safety (OHS) Act 2004 and WorkSafe Victoria. If you mainly operate plant, compare it with the Earthmoving and Mobile Plant pack before buying.

What still has to be tailored?

Before the SWMS goes to site, add:

See how to use a SWMS template and keeping, signing and reviewing a SWMS.

Victoria and other states

Victoria uses the Occupational Health and Safety Regulations 2017, made under the Occupational Health and Safety Act 2004. Its list of 19 types of high risk construction work includes construction work "involving a trench or shaft if the excavated depth is more than 1ยท5 metres" and "involving a tunnel" (regulation 322). Two Victorian rules are worth knowing:

The other states and territories have adopted the model WHS Regulations in their own laws, with the same regulation numbers for these rules. See SWMS requirements by state.

Common questions

Does every trench need a SWMS?

The trench category applies to work in or near a shaft or trench with an excavated depth greater than 1.5 metres, or a tunnel. A shallower trench dug with an excavator is usually still high risk construction work because powered mobile plant is moving in the area. Check every category against the actual job.

What does the law say about supporting a trench?

For a trench at least 1.5 metres deep, the model WHS Regulations (regulation 306) require all sides to be adequately supported by shoring, benching or battering, unless a geotechnical engineer gives written advice that all sides are safe from collapse. The work area must also be secured from unauthorised access, so far as is reasonably practicable.

Who has to find the underground services?

The person with management or control of the workplace must take all reasonable steps to obtain current underground essential services information before excavation starts, and give it to the people doing the work (regulation 304). The SWMS should say how services were located on site and how close plant can work to them.

Is a pit or shaft a confined space?

Some are. If it meets the definition of a confined space, a worker cannot be directed to enter it without a confined space entry permit, and the confined space category of high risk construction work also applies. A deep pit or shaft can trigger the trench or shaft category as well.

Do I need to notify the regulator before digging in Victoria?

Usually, for deeper work. Victoria requires written notice to WorkSafe Victoria at least 3 days before construction excavation work on a trench deeper than 1.5 metres, a shaft deeper than 2 metres, or a tunnel, with exceptions such as excavation for building work under a building permit.

Sources: Work Health and Safety Regulation 2011 (Qld), sections 67, 289, 291, 299, 304, 305 and 306, Model WHS Regulations numbering, Occupational Health and Safety Regulations 2017 (Vic), Authorised Version No. 018 (as at 20 October 2026), regulations 5 (construction excavation), 322, 331, 354 and 355, Safe Work Australia, Model Code of Practice, Safe Work Australia, Workplace Exposure Limits for airborne contaminants and Workplace Health and Safety Queensland, Safe work method statements ("use appropriate PPE").

Start from a proper SWMS, not a blank page

State-specific, editable templates written for your state. Download instantly, then make it yours for the job and the site.

This guide is general information, not legal or safety advice, and does not guarantee compliance. Laws and site conditions vary, so always check your state regulator and have documents reviewed by a competent person.