You need a Safe Work Method Statement (SWMS) for scaffolding work that is high risk construction work (HRCW). In practice that is most scaffolding: erecting, altering or dismantling a scaffold usually involves a risk of a person falling more than 2 metres, and deliveries often bring powered mobile plant onto the site. Work near overhead power lines, roads or traffic adds more categories.

Two other rules sit beside the SWMS. Scaffolding work where a person or object could fall more than 4 metres needs a high risk work licence, and some scaffolds cannot be used until a competent person confirms in writing that they are complete. This guide covers the SWMS, the licences and the handover rules.

For the general test, see do I need a SWMS?. For the full list, see high risk construction work: the 18 categories.

When is scaffolding construction work?

Construction work includes work carried out in connection with the construction, alteration, renovation, repair, maintenance or refurbishment of a structure (regulation 289 of the model Work Health and Safety (WHS) Regulations; section 289 of Queensland's WHS Regulation 2011). Scaffolding erected to support that work is part of it. Minor testing, maintenance or repair work on a structure is excluded (r 289(3)(d)), but that exclusion is about the work on the structure, not the scaffold that gives access to it.

Which high risk construction work categories matter for scaffolding?

The model WHS Regulations list 18 categories in regulation 291 (section 291 in Queensland). The ones scaffolders hit most are construction work that:

Safe Work Australia's construction duties guidance says you must prepare a SWMS for any scaffolding work that carries a risk of falling more than 2 metres.

Common scaffolding jobs and the categories they often trigger

This is a guide, not a ruling. The height, the scaffold type and what is around it decide which categories apply.

Common scaffolding jobs and the categories they often trigger
Scaffolding taskOften triggersNote
Erecting or dismantling fixed scaffoldFalls over 2 m; powered mobile plant during deliveriesA licence is needed above 4 m.
Altering a scaffold for other tradesFalls over 2 mOnly licensed scaffolders alter a scaffold above 4 m.
Mobile scaffold towersFalls over 2 m once platform height allowsCastor locks, ground conditions and the manufacturer's limits.
Suspended (swing stage) scaffoldsFalls over 2 mThe handover and inspection rules apply at any height.
Scaffold near overhead power linesEnergised electrical installations or servicesApproach distances come from your regulator and the network operator.
Scaffold beside a footpath or roadTraffic corridor; falls over 2 mGantries, hoarding and a traffic plan may also be needed.
Roof edge protection installationFalls over 2 mOften installed from the eaves with fall arrest or from a scaffold.
Scaffold on a building with asbestos claddingPossibly asbestosTie and anchor fixing can disturb asbestos.

What must a scaffolding SWMS cover?

Regulation 299 of the model WHS Regulations (section 299 in Queensland) says a SWMS must:

  1. identify the work that is high risk construction work
  2. state the hazards relating to that work and the risks to health and safety associated with those hazards
  3. describe the measures to be implemented to control the risks
  4. describe how the control measures are to be implemented, monitored and reviewed.

It must take into account the circumstances at the workplace and, on a construction project, the principal contractor's WHS management plan, and be readily accessible and understandable to the people who use it.

For scaffolding, that usually means the SWMS sets out:

Workplace Health and Safety Queensland (WHSQ) says statements such as "use appropriate PPE" (personal protective equipment) do not detail the control measures. Name the control you will use.

Licences, handover and inspection

High risk work licence. Scaffolding work means erecting, altering or dismantling a temporary structure that is or has been erected to support a platform, from which a person or object could fall more than 4 metres. A person must not carry out a class of high risk work unless they hold the licence for it (regulation 81 of the model WHS Regulations; section 81 in Queensland). The licence classes are basic, intermediate and advanced scaffolding (schedule 3).

Written confirmation before use. Regulation 225 (section 225 in Queensland) applies to suspended, cantilevered, spur and hung scaffolds, and to any other scaffold from which a person or thing could fall more than 4 metres. The person with management or control of the scaffold must not let it be used until a competent person confirms in writing that its construction has been completed.

Inspection. For the same scaffolds, regulation 225 requires a competent person to inspect the scaffold and its supporting structure before it is used, before use resumes after an incident that may affect its stability or after repairs, and at the regular interval set in the regulation. If an inspection finds a risk, the scaffold must be repaired, altered or added to and inspected again before use resumes. Unauthorised access must be prevented while the scaffold is incomplete or unattended, for example with danger tags and warning signs.

Queensland housing rule. Queensland adds rules for dismantling scaffolding on housing construction work (section 306Q). Check them if you work on houses in Queensland.

Safe Work Australia's Guide to scaffolds and scaffolding covers inspection, maintenance, tower and mobile scaffolds, suspended scaffolds and scaffolding near overhead electric lines.

What is in the Scaffolding pack?

The Scaffolding SWMS Trade Pack has 14 SWMS: one Scaffolding Master SWMS and 13 task SWMS:

The pack comes in editable Word with a free pack of 15 safe operating procedures (SOPs). Each state edition references that state's Act and regulator. It does not replace the scaffold design, the handover certificate or the scaffolders' licences.

What still has to be tailored?

Before the SWMS goes to site, add:

See how to use a SWMS template and keeping, signing and reviewing a SWMS.

Victoria and other states

Victoria uses the Occupational Health and Safety (OHS) Regulations 2017, made under the OHS Act 2004. Construction work where there is a risk of a person falling more than 2 metres is high risk construction work there too (regulation 322), and the falls rules in Part 3.3 require employers to work through a set order of controls: eliminate the risk, then a passive fall prevention device, then a work positioning system, then a fall arrest system, and only then a ladder or administrative controls (regulation 44). Victoria has its own high risk work licensing in Part 3.6, so check WorkSafe Victoria's licence requirements for scaffolding there.

The other states and territories have adopted the model WHS Regulations in their own laws. See SWMS requirements by state.

Common questions

Does scaffolding work need a SWMS?

Scaffolding work needs a Safe Work Method Statement (SWMS) when it is high risk construction work, which usually means a person could fall more than 2 metres. Safe Work Australia's construction duties guidance says you must prepare a SWMS for any scaffolding work that carries a risk of falling more than 2 metres.

When do I need a scaffolding licence?

Under the model WHS Regulations, scaffolding work means erecting, altering or dismantling a temporary structure that supports a platform from which a person or object could fall more than 4 metres. That work needs a high risk work licence at the basic, intermediate or advanced level, depending on the scaffold.

Who decides a scaffold can be used?

For scaffolds covered by regulation 225, such as any scaffold with a fall of more than 4 metres and all suspended, cantilevered, spur and hung scaffolds, the person with management or control must not allow it to be used until a competent person confirms in writing that construction is complete.

Do mobile scaffold towers need a SWMS?

If a person could fall more than 2 metres from the tower, the work is high risk construction work and needs a SWMS. The tower should be set up and used within the manufacturer's limits, and a fall of more than 4 metres also brings in the scaffolding licence and handover rules.

Is the list different in Victoria?

Victoria uses its own OHS Regulations 2017. Work with a risk of a fall of more than 2 metres is high risk construction work there too, but the falls rules and licensing are set out in Victoria's own regulations, so check WorkSafe Victoria's guidance.

Sources: Work Health and Safety Regulation 2011 (Qld), sections 81, 225, 289, 291, 299 and 306Q, schedule 3 and the schedule 19 definition of scaffolding work, Model WHS Regulations numbering, Safe Work Australia, Scaffolds and scaffolding work (construction duties tool), Safe Work Australia, Guide to scaffolds and scaffolding, Occupational Health and Safety Regulations 2017 (Vic), Authorised Version No. 018 (as at 20 October 2026), regulations 44 and 322, Part 3.6 and Workplace Health and Safety Queensland, Safe work method statements.

Start from a proper SWMS, not a blank page

State-specific, editable templates written for your state. Download instantly, then make it yours for the job and the site.

This guide is general information, not legal or safety advice, and does not guarantee compliance. Laws and site conditions vary, so always check your state regulator and have documents reviewed by a competent person.