Site Assessment & Set-Up Position
Assessing the pour site before the pump arrives and choosing the set-up position - access, ground, slope, overhead lines, excavations, structures, traffic and the reach the pour needs.
SWMS template. Editable Word document, written for your state, ready to adapt to the job.
Objective
Choose a position from which the pump can stand safely on its outriggers, reach the whole pour, stay clear of every power line and excavation, and be reached by agitator trucks without reversing through the crew.
Your state's laws, in the document
Each state version references the Act, regulator, and requirements for the state you select. Victoria gets the OHS Act and WorkSafe Victoria, NSW gets the WHS Act and SafeWork NSW.
Included in 1 Trade Pack
When you'd use this SWMS
If site assessment & set-up position is part of your job, the builder or head contractor will usually want a SWMS for it before you start on site. This one's editable in Word. Add your company and site details, check the hazards and controls against the actual job, and get your crew to sign on before work starts.
Not sure whether you need one? When a SWMS is required covers it, and the 18 high risk construction work categories are the list a principal contractor works from.
Doing the whole trade? The Concrete Pumping pack bundles this with the rest and works out cheaper. New to it? Here's what goes in a SWMS.
Related SWMS
Select your state to purchase
GST-inclusive. Instant download. Tax invoice provided.
Last review: 9 September 2026
Need a safety document we don’t have?
Our catalogue covers 105 trades, but not every job fits one. If a principal contractor has asked for something specific, or the work you do is not in the list, we write it from scratch for your trade and your state. Same format as everything else here: editable Word, your state's Act and regulator, ready to put your details on. We can also brand your SWMS pack with your logo and company details. We’ll write it for you →