Free guide

JSA template: what a good one includes

Last reviewed:

A good job safety analysis (JSA) template has space for the task, site and date, the job broken into steps in order, the hazards at each step, specific controls for each hazard, who is responsible, the plant, licences and personal protective equipment (PPE) involved, and a crew sign-on. The best ones are short enough that the crew actually reads them.

A JSA is a method, not a legal form, so there is no official layout. That is why templates vary so much, from a one-page table to a ten-page booklet. This guide sets out the fields that make a JSA useful on site, how to break a task into steps, how to write hazards and controls that mean something, and a short worked example.

New to JSAs? Start with what is a JSA?, and see SWMS vs JSA vs SOP for how it differs from a Safe Work Method Statement (SWMS).

Is there an official JSA template?

No. WorkSafe Victoria says risk assessments and job safety analyses are not required under legislation, but can be useful tools for identifying hazards and assessing risks, including for work that is not high risk construction work. What the law does require is that risks are managed. Safe Work Australia describes the process as identifying hazards, assessing risks, controlling risks and reviewing control measures. A JSA is one way of doing that for a single task, written down.

So the test of a JSA template is not whether it matches a government form. It is whether it helps the people doing the job think it through and agree on the controls before they start.

What fields should a JSA template have?

1. Job details

2. People, plant and permits

3. The job steps

The core of the JSA: the task broken into steps in the order they happen. A useful rule of thumb is between about five and fifteen steps for most tasks. Fewer than that and the steps are too broad to show the hazards; many more and it turns into a procedure.

Workplace Health and Safety Queensland gives similar advice for a SWMS that applies equally to a JSA: activities can be broken down into a series of basic steps, the description should not be so broad that it leaves out activities with the potential to cause incidents, and it does not need to go into fine detail.

4. Hazards at each step

What could cause harm at that step. Be specific to the step. "Kickback from the circular saw while cutting sheet" is a hazard. "Power tools" is a category.

5. Controls for each hazard

What will be done about each hazard, worked through the hierarchy of control: eliminate the hazard if you can, then substitute, isolate or use engineering controls, then administrative controls, then PPE. The controls column is where most JSAs fall down. Workplace Health and Safety Queensland warns that a statement such as "use appropriate PPE" does not detail the control measures; name the actual equipment. WorkSafe Victoria makes a similar point about SWMS: listing many control options to choose from does not describe what will actually be done.

6. Who is responsible

A name or role against each control, or at least against each step. "Leading hand checks the guard before the first cut" gives someone the job.

7. Risk rating (optional)

Many templates rate the risk before and after controls. It can help a crew see which steps need the most attention. It is not required by law, and WorkSafe Victoria's SWMS guidance says risk matrices and risk scores are not legally required in a SWMS. If you use a rating, keep the matrix simple and explain it on the form.

8. Sign-on and review

What does a good JSA look like? An illustrative example

Illustrative example. The extract below is a made-up example written for this guide to show the format. It is not a ready-to-use JSA for your job. Adapt it to your own site, task and conditions before you use any of it.

Task: Cutting fibre cement sheet with a circular saw for a ground floor wall. Site: [address]. Plant: fibre cement shears, circular saw with fibre cement blade, H-class vacuum.

What does a good JSA look like? An illustrative example
StepHazardsControlsWho
1. Set up cutting areaTrips over leads; dust drifting to other tradesCutting area set up downwind and away from walkways; leads run overhead or along walls; barrier tape around the areaLeading hand
2. Check saw and vacuumDamaged guard or lead; vacuum not workingGuard, blade and lead checked before use; vacuum tested with the saw; faulty gear tagged outOperator
3. Mark and support sheetSheet sagging and pinching the blade; manual handlingSheet supported flat on trestles or a bench, with the offcut supported so it cannot drop or pinch the blade; two-person lift for full sheetsOperator and offsider
4. Cut sheetRespirable dust; kickback; noise; flying particlesShears or score-and-snap used instead of the saw wherever the cut allows; for saw cuts, on-tool extraction connected to the H-class vacuum; no one else within the barrier; both hands on saw; P2 respirator, safety glasses and hearing protection wornOperator
5. Clean upDust disturbed by sweepingVacuum only, no dry sweeping or compressed air; offcuts baggedOperator

Notice what the controls do. Each one is something you could check on site. Each has a person against it. None says "take care" or "use appropriate PPE".

If the sheet product contains crystalline silica (check the safety data sheet) and the processing is assessed as high risk, the silica rules may need a silica risk control plan as well. In the ACT, cutting crystalline silica material such as a cement product with a power tool is itself high risk construction work, so a SWMS is needed, not just a JSA. See what is a silica risk control plan?.

Signs of a weak JSA template

JSA, SWMS or Take 5?

A JSA is not a substitute for a SWMS. If the task is high risk construction work, the Work Health and Safety (WHS) Regulations require a SWMS before it starts. A JSA is for tasks outside that list, or for extra detail alongside a SWMS. A Take 5 is a much shorter personal check done just before a task. See what is a Take 5? and do I need a SWMS?.

Starting from a template

You can build a JSA from a blank page, and for unusual work you may need to. For common tasks it is faster to start from one that already has the steps, hazards and controls drafted, then adapt it to the site and the crew.

Our JSA templates cover 408 tasks across the trades, in editable Word. Each one sets out the job steps, the hazards at each step, a risk rating, the control measures and the residual risk, with fields for your company, site, date, personnel and crew sign-on. The Carpentry Master JSA, for example, breaks carpentry into 9 steps, from receiving and handling materials to work at height.

Whatever you start from, read it against the actual job, add the hazards on that site, take out what does not apply, and talk it through with the crew before they sign. You can also work out the hazards first with our free Risk Assessment Builder.

Common questions

What should a JSA template include?

A job safety analysis (JSA) template should include the task, site and date, the people and plant involved, the job broken into steps, the hazards at each step, specific controls for each hazard, who is responsible for each control, and a crew sign-on with review triggers. A risk rating is optional.

Is a JSA a legal requirement in Australia?

No. WorkSafe Victoria says job safety analyses are not required under legislation but can be useful for identifying hazards and assessing risks. Many principal contractors and clients require them as a site rule, and the duty to manage risks still applies.

How many steps should a JSA have?

Enough to show the hazards without turning into a procedure. For most tasks that is roughly five to fifteen steps. If a step hides several different hazards, split it.

Do I need a risk matrix on a JSA?

No law requires one. A simple before-and-after rating can help a crew focus on the riskiest steps, but the controls matter more than the score. WorkSafe Victoria's guidance says risk matrices and scores are not legally required in a SWMS.

Can a JSA replace a SWMS?

No. If the task is high risk construction work, a Safe Work Method Statement (SWMS) is required before the work starts. A JSA can sit alongside a SWMS for extra detail, or cover tasks that are not high risk construction work.

Sources: WorkSafe Victoria, Safe work method statements (SWMS), Workplace Health and Safety Queensland, Safe work method statements and Safe Work Australia, Identify, assess and control hazards.

Start from a proper SWMS, not a blank page

State-specific, editable templates written for your state. Download instantly, then make it yours for the job and the site.

This guide is general information, not legal or safety advice, and does not guarantee compliance. Laws and site conditions vary, so always check your state regulator and have documents reviewed by a competent person.