Temporary Electrical Connections SWMS
Installation and management of temporary builders' supplies, distribution boards, leads and site lighting.
SWMS templates. Editable Word documents, written for your state, ready to adapt to the job.
There are 3 versions of this SWMS
The hazards, controls and task steps in each one are written around the work that trade actually does. Pick the closest match to your work, then your state.
What this version covers
Installation and management of temporary builders' supplies, distribution boards, leads and site lighting.
Objective
Complete the work safely by controlling fatal shock from non-compliant or weather-damaged supply through licensed installation to AS/NZS 3012, residual current device (RCD) protection on every circuit and leads kept off the ground.
Full details for this version →All 3 versions
Installation and management of temporary builders' supplies, distribution boards, leads and site lighting.
Installation and management of temporary builders' supplies, distribution boards, leads and site lighting.
Installation and management of temporary builders' supplies, distribution boards, leads and site lighting.
Your state
GST-inclusive. Instant download. Tax invoice provided.
Need a safety document we don’t have?
Our catalogue covers 105 trades, but not every job fits one. If a principal contractor has asked for something specific, or the work you do is not in the list, we write it from scratch for your trade and your state. Same format as everything else here: editable Word, your state's Act and regulator, ready to put your details on. We can also brand your SWMS pack with your logo and company details. We’ll write it for you →