Complete management system

Concreting All-In WHS Pack Standard WHS

The WHS management system for concreting work, written for the state you select. Every document is numbered and cross-referenced, so the procedures point at the forms, the forms feed the registers, and the whole thing holds together as one system.

$999

One-off, GST inclusive

258

documents

8

state editions

34

SWMS included

55

core system documents

How the system is built

Four layers. The first is your business, the second is your jobs, the third is what goes to the crew, and the fourth is your people. Documents that record something point back at the procedure that requires them.

The SWMS in layer three are the same documents sold as the Concreting trade pack.

Standard WHS is the working system: how hazards get identified and controlled, how incidents are reported and investigated, how workers are consulted, trained and supervised, and how each of those is recorded. It is structured around the duties the WHS Act and Regulations place on a business, with review and improvement carried by a single procedure.

01Core system
55 documents

The governing layer of the system, and the part that does not change from job to job. Your WHS policy set, the management system manual, the procedures that define how the business operates, and the registers that evidence it.

Policies10Plans and manuals2Procedures11Registers18Forms14
02Project and site
48 documents

The operational layer, applied to each project you win. The project WHS plan, the procedures that govern how the job is run, the registers that track it, and the site forms that feed those registers.

Project plans6Project procedures14Project registers12Project forms16
03Safe work documents
83 documents

The documents issued to the workforce. Every SWMS in the concreting trade pack, safe operating procedures for each task, job safety analyses for assessment on the day, and pre-start inspection checklists for plant and equipment.

SWMS34SOPs27JSAs13Pre-start inspections9
04Training and competency
71 documents

The record that your people are inducted into the system and competent in it. Verification of competency assessments for plant operators, toolbox talks for delivery on site, and structured training packages for formal sessions.

VOCs42Toolbox talks17Training packages12

Every document in the pack

Read straight off the concreting pack. Search it or open a section.

Start here1 documents

Documents(1)

  • IMP-001Start Here Guide - All-In WHS Pack
Core system61 documents

Policies(10)

  • POL-001Health and Safety Policy
  • POL-002Drug and Alcohol Policy
  • POL-003Mental Health and Wellbeing Policy
  • POL-004Fatigue Management Policy
  • POL-005Fitness for Work Policy
  • POL-006Return to Work and Injury Management Policy
  • POL-007Working from Heights Policy
  • POL-008Psychosocial Hazard Management Policy
  • POL-009Workplace Bullying Harassment and Sexual Harassment Prevention Policy
  • POL-010Asbestos Management Policy

Plans and Manuals(2)

  • PLN-001WHS Manual
  • PLN-002Emergency and Evacuation Plan

Procedures(11)

  • PRO-001Documents and Records Control Procedure
  • PRO-002Training and Competency Procedure
  • PRO-003Incident Reporting and Investigation Procedure
  • PRO-004Risk and Hazard Management Procedure
  • PRO-005Emergency Response Procedure
  • PRO-006Procurement and Subcontractor Management Procedure
  • PRO-007Plant, Equipment and Asset Management Procedure
  • PRO-008WHS Review and Improvement Procedure
  • PRO-012Worker Consultation and Participation Procedure
  • PRO-015Communications Procedure
  • PRO-016Psychosocial Hazard Management Procedure

Registers(18)

  • REG-001Documents and Records
  • REG-002Training Records Register
  • REG-003Incident and Corrective Action Register
  • REG-004Risk Management Register
  • REG-005Subcontractor and Supplier Register
  • REG-006SDS and Hazardous Substances Register
  • REG-007Equipment Register
  • REG-008Inspection Register
  • REG-009Legal and Other Requirements Register
  • REG-010Safety Goals Register
  • REG-011Test and Tag and RCD Register
  • REG-012Lifting Gear Register
  • REG-013Health Monitoring Register
  • REG-014Licences Registrations and Insurances Register
  • REG-015Height Safety Equipment Register
  • REG-016Fleet and Vehicle Maintenance Register
  • REG-017Emergency Equipment Register
  • REG-018Hire Plant Register

Forms(14)

  • FOR-001Training and Competency Form
  • FOR-002Internal Audit Form
  • FOR-003Incident Investigation Form
  • FOR-004Meeting Minutes Form
  • FOR-005Issue and Action Form
  • FOR-006Workplace Inspection Form
  • FOR-007Supplier and Subcontractor Evaluation Form
  • FOR-008Company Induction Form
  • FOR-009Emergency Report Form
  • FOR-010Vehicle Pre-Start Checklist
  • FOR-011Management Review Agenda and Minutes
  • FOR-012Psychosocial Hazard Identification and Risk Assessment Worksheet
  • FOR-013Psychosocial Hazard and Wellbeing Survey
  • FOR-014Psychosocial Incident and Complaint Report Form
Project and site47 documents

Project Plans(6)

  • PLN-P01Project WHS Management Plan
  • PLN-P02Site Incident Flow
  • PLN-P03Site Emergency Response and Evacuation Plan
  • PLN-P04Site Evacuation Map
  • PLN-P05Traffic and Pedestrian Management Plan
  • PLN-P06Silica Risk Control Plan

Project Procedures(14)

  • PRO-010Site Establishment and Site Safety Procedure
  • PRO-P01Site Induction and Access Control Procedure
  • PRO-P02Toolbox Talks and Pre-Start Briefings Procedure
  • PRO-P03Permit to Work Procedure
  • PRO-P04Site Inspection and Housekeeping Procedure
  • PRO-P05Subcontractor Site Management Procedure
  • PRO-P06Plant and Equipment Management Procedure
  • PRO-P07Site Emergency Response Procedure
  • PRO-P08Working at Height and Rescue Procedure
  • PRO-P09Excavation and Ground Disturbance Procedure
  • PRO-P10Lifting Operations Procedure
  • PRO-P11Hazardous Chemicals Management Procedure
  • PRO-P12Environmental Site Controls Procedure
  • PRO-P13Fatigue and Chain of Responsibility Procedure

Project Registers(12)

  • REG-P01Project Document Register
  • REG-P02Project Risk Register
  • REG-P03Project Subcontractor Register
  • REG-P04Site Induction Register
  • REG-P05Site Plant and Equipment Register
  • REG-P06Site Attendance and Visitor Register
  • REG-P07Site Hazardous Substances Register
  • REG-P08Project Incident and Hazard Register
  • REG-P09Chemical Application Register
  • REG-P10Permits and Approvals Register
  • REG-P11Environmental Controls Register
  • REG-P12Permit to Work Register

Project Forms(16)

  • FOR-P01Project Start Checklist
  • FOR-P02Toolbox Talk Record
  • FOR-P03Project Site Rules
  • FOR-P04Daily Site Diary
  • FOR-P05Subcontractor Site Start Checklist
  • FOR-P06Permit to Work
  • FOR-P07SWMS Review Checklist
  • FOR-P08SWMS Monitoring Record
  • FOR-P09What To Do - Fire
  • FOR-P10What To Do - Injury
  • FOR-P11Site Reporting Quick Reference Card
  • FOR-P12Construction Site Inspection Checklist
  • FOR-P13Project Communication and Contacts Sheet
  • FOR-P17Concrete Delivery and Slump Log
  • FOR-P18Pre-Pour Inspection Sign-Off
  • FOR-P19Concrete Pour and Post-Tensioning Permit
Safe work documents83 documents

SWMS(34)

  • FOR-P15-01Concreting - Master SWMS
  • FOR-P15-02Site Establishment & Setout
  • FOR-P15-03Manual Handling
  • FOR-P15-04Material Handling, Loading & Unloading
  • FOR-P15-05Truck Operations & Deliveries
  • FOR-P15-06Excavation Near Assets
  • FOR-P15-07Trench Excavation
  • FOR-P15-08Steel Fixing
  • FOR-P15-09Formwork - Decks, Columns & Stairs
  • FOR-P15-10Concrete Foundations - Excavating & Pouring
  • FOR-P15-11Concrete Slab on Ground
  • FOR-P15-12Concrete Waffle Pod Raft System
  • FOR-P15-13Concrete Piling
  • FOR-P15-14Concrete Underpinning
  • FOR-P15-15Mobile Concrete Batching
  • FOR-P15-16Concrete Pumping (Boom - Line)
  • FOR-P15-17Grout Pump
  • FOR-P15-18Concrete Placement & Finishing
  • FOR-P15-19Shotcrete
  • FOR-P15-20Pre-cast - Tilt-up Panels
  • FOR-P15-21Tilt-up Panel Lifting
  • FOR-P15-22Concrete Kerb & Channel
  • FOR-P15-23Concrete Sawing & Core Drilling
  • FOR-P15-24Concrete Scanning
  • FOR-P15-25Concrete Chasing
  • FOR-P15-26Concrete Grinding & Polishing
  • FOR-P15-27Decorative Concrete Sealing
  • FOR-P15-28Caulking, Grouting & Patching
  • FOR-P15-29Concrete Washout Collection
  • FOR-P15-30Mobile Concrete Crusher
  • FOR-P15-31Hazardous Substances
  • FOR-P15-32Working in Private Residences
  • FOR-P15-33Silica Dust
  • FOR-P15-34Heat Stress

SOPs(27)

  • SOP-CN01Concrete Line Pump
  • SOP-CN02Concrete Boom Pump
  • SOP-CN03Portable Concrete Mixer
  • SOP-CN04Poker - Immersion Vibrator
  • SOP-CN05Power Float - Helicopter Trowel
  • SOP-CN06Power Screed - Screed Board
  • SOP-CN07Concrete - Road Saw - Saw Cutting
  • SOP-CN08Core Drilling Rig (Wet & Dry)
  • SOP-CN09Concrete Grinder - Scarifier
  • SOP-CN10Bull Float & Hand Finishing Tools
  • SOP-CN12Reo Bar Cutter - Bender
  • SOP-CN13Tilt-Up - Precast Bracing & Rigging
  • SOP-CP01Concrete Pipeline, Clamps, End Hose & Sponge Ball Catcher
  • SOP-G01Angle Grinder
  • SOP-G03Circular Saw
  • SOP-G06Drill - Hammer Drill
  • SOP-G07Impact Wrench - Driver
  • SOP-G08Jackhammer - Breaker
  • SOP-G11Portable Generator
  • SOP-G13Wet-Dry Vacuum & Dust Extraction (H-Class)
  • SOP-G14Extension Leads, RCDs and Portable Power
  • SOP-G20Manual Handling - Team Lifting
  • SOP-G23Slings, Shackles and Lifting Gear
  • SOP-G24Crane Lift - Rigging (Dogging)
  • SOP-G25Hazardous Substance Handling & Storage
  • SOP-G26Fuel Storage and Refuelling
  • SOP-G27Spill Response & Spill Kit Use

JSAs(13)

  • FOR-P16Concrete Boom or Line Pumping
  • FOR-P16Concrete Foundations
  • FOR-P16Concrete Grinding and Polishing
  • FOR-P16Concrete Placement and Finishing
  • FOR-P16Concrete Sawing and Core Drilling
  • FOR-P16Concrete Slab on Ground
  • FOR-P16Concrete Steel Fixing
  • FOR-P16Concrete Underpinning
  • FOR-P16Concreting (Master)
  • FOR-P16Formwork Decks Columns and Stairs
  • FOR-P16Loading and Unloading Trucks
  • FOR-P16Loading and Unloading Vehicles - Utes
  • FOR-P16Pre-cast Tilt-up Panels

Pre-Start Inspections(9)

  • FOR-P14INSP_01_Excavator Pre-Start and Daily Inspection
  • FOR-P14INSP_02_Wheel Loader and Front-End Loader Pre-Start and Daily Inspection
  • FOR-P14INSP_03_Concrete Pump - Boom Pump Pre-Start and Daily Inspection
  • FOR-P14INSP_04_Power Float - Trowel Pre-Start and Daily Inspection
  • FOR-P14INSP_05_Concrete Saw Pre-Start and Daily Inspection
  • FOR-P14INSP_06_Core Drill Pre-Start and Daily Inspection
  • FOR-P14INSP_07_Concrete Line Pump Pre-Start and Daily Inspection
  • FOR-P14INSP_08_Concrete Agitator Truck Pre-Start and Daily Inspection
  • FOR-P14Plant Inspection - Template
Training and competency71 documents

VOCs(42)

  • VOC-CN01Concrete Line Pump
  • VOC-CN02Concrete Boom Pump
  • VOC-CN03Portable Concrete Mixer
  • VOC-CN04Poker - Immersion Vibrator
  • VOC-CN05Power Float - Helicopter Trowel
  • VOC-CN06Power Screed - Screed Board
  • VOC-CN07Concrete - Road Saw - Saw Cutting
  • VOC-CN08Core Drilling Rig (Wet & Dry)
  • VOC-CN09Concrete Grinder - Scarifier
  • VOC-CN10Bull Float & Hand Finishing Tools
  • VOC-CN11Post-Tensioning Stressing Jack
  • VOC-CN12Reo Bar Cutter - Bender
  • VOC-CN13Tilt-Up - Precast Bracing & Rigging
  • VOC-CP01Concrete Pipeline, Clamps, End Hose and Sponge Ball Catcher
  • VOC-CV01Excavator
  • VOC-CV02Wheel Loader - Front-End Loader
  • VOC-CV11Plate Compactor (Wacker)
  • VOC-G01Angle Grinder
  • VOC-G03Circular Saw
  • VOC-G06Drill - Hammer Drill
  • VOC-G07Impact Wrench - Driver
  • VOC-G08Jackhammer - Breaker
  • VOC-G11Portable Generator
  • VOC-G13Wet-Dry Vacuum & Dust Extraction (H-Class)
  • VOC-G14Extension Leads, RCDs & Portable Power
  • VOC-G20Manual Handling - Team Lifting
  • VOC-G23Slings, Shackles and Lifting Gear
  • VOC-G24Crane Lift - Rigging (Dogging)
  • VOC-G25Hazardous Substance Handling & Storage
  • VOC-G26Fuel Storage and Refuelling
  • VOC-G27Spill Response & Spill Kit Use
  • VOC-G28Fire Extinguisher Use
  • VOC-G30Vehicle - Ute Pre-Start and Safe Driving
  • VOC-SK01Working at Heights - Harness and Fall Arrest
  • VOC-SK03Scaffolding - Mobile Towers and Low-Level Platforms
  • VOC-SK04Dogging and Slinging Loads
  • VOC-SK05Traffic Control - Stop-Slow Bat
  • VOC-SK08Trenching and Ground Support
  • VOC-SK10Plant and Powerline Spotter
  • VOC-SK11Basic Rigging (Currency)
  • VOC-TV02Concrete Agitator Truck
  • VOC-TV03Tipper Truck (incl. Truck and Dog)

Toolbox Talks(17)

  • TT-00Introduction to the WHS Management System
  • TT-01Before You Dig Australia (BYDA) - Service Location and Potholing
  • TT-02Traffic Spotter Duties - Workzone Interface
  • TT-03Trench Collapse Prevention
  • TT-04Hot Weather Work - Heat Illness Prevention
  • TT-05Manual Handling - Mechanical Aids and Technique
  • TT-06Plant Exclusion Zones - Worker-Plant Interaction
  • TT-07Working Near Live Services - Power, Gas, Water, Comms
  • TT-08Dust Control on Site - Silica and Visibility
  • TT-09Slips, Trips and Falls - Site Housekeeping
  • TT-10Tool and Equipment Tethering - Working at Heights
  • TT-11Refuelling Plant - Fire and Environmental
  • TT-12Near-Miss Reporting - Why We Report
  • TT-13Fatigue Management - Long Shifts and Night Work
  • TT-14PPE Compliance - Daily Checks and Replacement
  • TT-15Site Emergency Response - What To Do
  • TT-16Psychosocial Hazards and Respectful Workplace

Training Packages(12)

  • TP-01System Overview and Awareness
  • TP-02WHS Management and Site Safety
  • TP-03Plant Traffic and Site Vehicles
  • TP-04Permits and High-Risk Work
  • TP-05Health Hazards on Site
  • TP-06Leadership and Due Diligence
  • TP-07Risk Assessment and SWMS in Practice
  • TP-08Incident Response and Investigation
  • TP-09Psychosocial Hazards for Leaders
  • TP-10Managing Subcontractors
  • TP-11Housekeeping Site Standards and Public Protection
  • TP-12Emergency Preparedness and Drills

Written for one state, not eight

Each edition references the Act, the regulator and the terms used where the work is. Victoria is not a WHS state: it runs the Occupational Health and Safety Act 2004 with employers and employees, where the harmonised states run a WHS Act with a PCBU. The edition you choose uses the language of your jurisdiction the whole way through.

ACTWork Health and Safety Act 2011NSWWork Health and Safety Act 2011NTWork Health and Safety (National Uniform Legislation) Act 2011QLDWork Health and Safety Act 2011SAWork Health and Safety Act 2012TASWork Health and Safety Act 2012VICOccupational Health and Safety Act 2004WAWork Health and Safety Act 2020

Who buys this

Scattered documents

A concreting business with SWMS, a policy and forms collected over time, kept in different places and not referencing one another.

Rebuilding the same paperwork

Operations that put safety documents together again for each new job, rather than working from one numbered and cross-referenced set.

Several crews, several sites

Businesses where hazards, training and records now have to be handled the same way across crews, rather than by being on every site.

These are editable templates for you to adapt to your business and your sites. They are not certification and they are not advice. A competent person needs to complete and review them for the work you actually do.

What happens after you buy

1

Download

An email with your download link lands straight after checkout, along with a tax invoice. One file, your state edition.

2

Make it yours

Logo, company details, the plant you own and the way you work. Start with the core system, which is your business, then the project and site layer, which is your jobs.

3

Put it to work

Induct the crew off the training decks, run the toolbox talks, and open the project folder on the next job.

Questions

What do I actually get?

258 documents in the Standard edition and 263 in ISO 45001, in one download, in four folders, with a Start Here guide at the top. The core system is 61 documents: policies, the WHS manual, procedures, registers and forms. On top of that, 47 project and site documents; 83 safe work documents, being 34 SWMS, 27 SOPs, 13 JSAs and 9 pre-start inspections; and 71 for training and competency. Everything is numbered and cross-referenced so the procedures point at the forms and the forms feed the registers.

Do I still have to fill it in?

Yeah, and it's more than filling in the blanks. The drafting is done: the structure, the procedures and the legislation named for your state. What it can't know is your business, so your part is to check that what it references matches the work you actually do, and add anything specific to it. Put your business into it: your company details, how you actually run jobs, the plant you actually own, and the hazards on your sites. A competent person has to read it and be satisfied it suits the work you do. It is a system to adapt, not a certificate.

Which state do I choose?

The one you work in. Each edition is written against that jurisdiction, so the NSW edition runs on the WHS Act and SafeWork NSW, and the Victorian edition runs on the Occupational Health and Safety Act 2004 with employers and employees rather than a PCBU. If you work across borders, pick the state your head office sits in and adapt the rest.

Will this get me ISO 45001 certified?

No, and nobody selling you a document can. Certification comes from an external audit of what you actually do. What this gives you is the documented information a certification audit works from, in a structure that maps to the standard, so the gap you are closing is your practice rather than your paperwork.

Can I put my logo on it and change it?

It's editable Word and Excel. Add your logo, change the wording, delete what does not apply and add what does. Once you buy it you can use it across your own business and your own jobs for as long as you like.

How do I get it?

Straight after checkout. You get an email with a download link for the edition you chose, as one file. A tax invoice comes with it.

$999

One-off payment, GST inclusive. No subscription, no renewal.

Select your state

Editable .docx and .xlsx. Instant download. Tax invoice provided.


258 documents, editable in Word and Excel
The full 34 SWMS set for concreting
55 core system documents, numbered and cross-referenced
71 training and competency documents
Yours to use across your own business, no renewal

$999

Concreting All-In

Choose your state

Need your pack tailored to your business?

The pack is written to be adapted, and most businesses do that themselves. If you would rather not, we can do it with you: your company details and branding through the set, the procedures matched to how you actually run concreting work, and the plant and tasks in your registers rather than a generic list. Tell us the scope and we will quote it.

Get a quote