Subfloor Preparation, Repairs & Levelling SWMS
Getting a subfloor ready for timber: moisture testing, grinding and scarifying a slab, levelling compounds and primers, and repairing bearers, joists and sheeting.
SWMS templates. Editable Word documents, written for your state, ready to adapt to the job.
There are 2 versions of this SWMS
The hazards, controls and task steps in each one are written around the work that trade actually does. Pick the closest match to your work, then your state.
What this version covers
Getting a subfloor ready for a new covering: moisture testing, grinding and scarifying a slab, levelling compounds and primers, and repairing bearers, joists and sheeting.
Objective
Control services concealed in and under the floor, silica from grinding, cement burns and compound dust, and restricted subfloor work, before the covering goes down.
Full details for this version →All 2 versions
Getting a subfloor ready for a new covering: moisture testing, grinding and scarifying a slab, levelling compounds and primers, and repairing bearers, joists and sheeting.
Getting a subfloor ready for timber: moisture testing, grinding and scarifying a slab, levelling compounds and primers, and repairing bearers, joists and sheeting.
Your state
GST-inclusive. Instant download. Tax invoice provided.
Need a safety document we don’t have?
Our catalogue covers 105 trades, but not every job fits one. If a principal contractor has asked for something specific, or the work you do is not in the list, we write it from scratch for your trade and your state. Same format as everything else here: editable Word, your state's Act and regulator, ready to put your details on. We can also brand your SWMS pack with your logo and company details. We’ll write it for you →