Subbase Preparation & Edging SWMS
Preparing subbases for rubber and synthetic surfaces including base laying, compaction and drainage, and installing timber and steel edging.
SWMS templates. Editable Word documents, written for your state, ready to adapt to the job.
There are 3 versions of this SWMS
The hazards, controls and task steps in each one are written around the work that trade actually does. Pick the closest match to your work, then your state.
What this version covers
Preparing subbases for rubber and synthetic surfaces including base laying, compaction and drainage, and installing timber and steel edging.
Objective
Complete the work safely by controlling struck-by plant, compaction hand-arm vibration syndrome (HAVS) and noise, crushed-rock silica dust and manual handling through exclusion zones, trigger-time management, dust suppression and mechanical aids.
Full details for this version →All 3 versions
Preparing subbases for rubber and synthetic surfaces including base laying, compaction and drainage, and installing timber and steel edging.
Preparing subbases for rubber softfall surfaces including base laying, compaction and drainage, and installing timber and steel edging.
Preparing subbases for synthetic turf surfaces including base laying, compaction and drainage, and installing timber and steel edging.
Your state
GST-inclusive. Instant download. Tax invoice provided.
Need a safety document we don’t have?
Our catalogue covers 105 trades, but not every job fits one. If a principal contractor has asked for something specific, or the work you do is not in the list, we write it from scratch for your trade and your state. Same format as everything else here: editable Word, your state's Act and regulator, ready to put your details on. We can also brand your SWMS pack with your logo and company details. We’ll write it for you →