Soft Demolition - Strip-Out SWMS
Soft demolition and strip-out: removing fixtures, linings and non-structural elements.
SWMS templates. Editable Word documents, written for your state, ready to adapt to the job.
There are 4 versions of this SWMS
The hazards, controls and task steps in each one are written around the work that trade actually does. Pick the closest match to your work, then your state.
What this version covers
Internal non-structural strip-out of fit-out, linings, ceilings, services and fixtures without disturbing structural elements.
Objective
Complete the work safely by controlling hidden live services, asbestos disturbance, falls from height and dust, through prove-dead isolation, asbestos survey before strip, edge & access controls and water suppression with P2 respiratory protective equipment (RPE).
Full details for this version →All 4 versions
Internal non-structural strip-out of fit-out, linings, ceilings, services and fixtures without disturbing structural elements.
Non-structural strip-out of linings, ceilings, fixtures, partitions and joinery ahead of construction works.
Internal non-structural strip-out of fit-out, linings, ceilings, services and fixtures without disturbing structural elements.
Internal non-structural strip-out of an existing fit-out - linings, ceilings, partitions, services and fixtures - in occupied or tenanted premises without disturbing structural elements.
Your state
GST-inclusive. Instant download. Tax invoice provided.
Need a safety document we don’t have?
Our catalogue covers 105 trades, but not every job fits one. If a principal contractor has asked for something specific, or the work you do is not in the list, we write it from scratch for your trade and your state. Same format as everything else here: editable Word, your state's Act and regulator, ready to put your details on. We can also brand your SWMS pack with your logo and company details. We’ll write it for you →