Site Establishment & Setout SWMS
Setting up the work site: access, amenities, fencing and hoarding, services check, signage and setout before work begins.
SWMS templates. Editable Word documents, written for your state, ready to adapt to the job.
There are 95 versions of this SWMS
The hazards, controls and task steps in each one are written around the work that trade actually does. Pick the closest match to your work, then your state.
What this version covers
Establishing the work site before construction - site access, amenities and laydown, perimeter fencing, traffic and pedestrian management, locating services, temporary power, and setting out the works.
Objective
Separate the public and workers from the works, identify and avoid underground and overhead services, and put traffic, access, environmental and emergency controls in place before work starts.
Full details for this version →All 95 versions
Establishing the work site before construction - site access, amenities and laydown, perimeter fencing, traffic and pedestrian management, locating services, temporary power, and setting out the works.
Setting up in plant rooms, on roofs and in occupied buildings for acoustic works - access, laydown for panels, bases and isolators, crane and hoist positions, exclusion zones and setting out isolator and panel positions.
Setting up the work area on a host or construction site - access, laydown, amenities, signage and marking out before HVAC&R work begins.
Establishing an arborist work site - access, exclusion zones, laydown, amenities and setout of the work area before tree work begins.
Establishing the asbestos work site before removal - confirming the asbestos register, access and amenities, exclusion zones and signage, decontamination unit set-up, perimeter security, traffic and pedestrian management and temporary services.
Setting up at a battery or off-grid installation - the battery room, garage or enclosure, delivery and unloading of modules, laydown, isolation points, occupants and setting out the battery, inverter and cable routes.
Establishing a blinds, awnings and window furnishings installation at a new site - access, induction, staging materials and equipment, signage, barriers and exclusion zones before work starts.
Establishing the bricklaying work area including site inspection, amenities and access, locating services and setting out walls and levels.
Establishing the carpentry work site before construction - access, amenities and laydown, perimeter fencing and hoarding, traffic and pedestrian management, locating services, temporary power and water, and setting out the works.
Setting up a floor covering job: access, laydown for rolls and cartons, isolating the area, power, ventilation, protection of the building, and setting out.
Establishing a caulking and sealant operation at a new site - access, induction, staging equipment and chemicals, signage, barriers and exclusion zones before work starts.
Establishing the ceilings and partitions work area including induction, exclusion zones, laydown, occupant separation and services identification.
Establishing a cleaning operation at a new site or contract - access and induction, staging equipment and chemicals, signage and barriers, and setting up amenities, leads and exclusion zones before cleaning starts.
Establishing a commercial or office cleaning contract at a new site - access, induction, staging equipment and chemicals, signage and exclusion zones before work starts.
Setting up at a refrigeration job in a supermarket, food plant, cold store, kitchen or plant room - the operator's permit, plant room and roof access, panel and plant deliveries, refrigerant storage and setout.
Setting up the cutting work area on the host site - access, exclusion, services check, amenities and unloading of plant and equipment.
Setting up for concrete grinding and polishing in warehouses, retail, car parks and homes - isolating the floor area, power supply, dust and slurry containment, machine laydown and the grinding plan.
Setting up the work area, establishing access, laydown and exclusion zones, and setting out the pump position and pipeline route for concrete pumping works.
Establishing the concreting work site - access, amenities and laydown, perimeter fencing and hoarding, traffic and pedestrian management, locating services, temporary power and water, and setting out the works.
Mobilising to site and setting up the work area for confined space operations, including access, amenities, exclusion zones, signage and services check.
Setting up a remediation site - access, laydown, the support zone, exclusion and decontamination zones, stockpile areas and truck routes - and setting out the excavation and validation grid.
Establishing the work site before construction - access, amenities and laydown, perimeter fencing and hoarding, traffic and pedestrian management, locating services, temporary power and water connections, and setting out the works.
Establishing the data & communications work area including induction, exclusion zones, amenities, lead & material staging, and setting out the work before cabling and civil tasks begin.
Establishing a deck, pergola or outdoor structure site before construction - access, setout, materials laydown, perimeter fencing and locating underground and overhead services.
Establishing the work site before demolition - access, amenities and laydown, perimeter fencing and hoarding, traffic and pedestrian management, locating services, temporary power and water, and setting out the works.
Setting up a drainage worksite on a road reserve, in a yard or inside a building - traffic control, pit and trench barricades, jetter and truck positions, laydown for pipe and setting out the drain line.
Establishing the work site before construction - access, amenities and laydown, perimeter fencing and hoarding, traffic and pedestrian management, locating services, temporary power and water, and setting out the works.
Establishing the work site before electrical, HVAC and solar works begin - access, amenities and laydown, perimeter fencing and hoarding, traffic and pedestrian management, locating services, temporary power and water connections, and setting out the works.
Establishing the work site before electrical, HVAC and solar works begin - access, amenities and laydown, perimeter fencing and hoarding, traffic and pedestrian management, locating services, temporary power and water connections, and setting out the works.
Establishing the work site before electrical, HVAC and solar works begin - access, amenities and laydown, perimeter fencing and hoarding, traffic and pedestrian management, locating services, temporary power and water connections, and setting out the works.
Establishing the work site before electrical, HVAC and solar works begin - access, amenities and laydown, perimeter fencing and hoarding, traffic and pedestrian management, locating services, temporary power and water connections, and setting out the works.
Setting up for resin flooring inside warehouses, plants, car parks and occupied buildings - isolating the floor area, ventilation and power, laydown for resin and aggregate, and setting out the pour.
Establishing the event site including access, amenities, exclusion zones, signage and survey setout of structures and services before bump-in.
Establishing the facade and remedial building work area including induction, public protection, exclusion zones, laydown and services identification on an occupied building.
Establishing the fencing work area including site inspection, induction, laydown, exclusion zones, locating services and setting out the fence line.
Establishing the work area for fire protection works including access, amenities, exclusion zones, signage and marking out before work begins.
Setting up on a site or in an occupied building for firestop works - access to risers, ceilings and soffits, material storage, mixing stations, exclusion zones and marking the penetrations to be sealed.
Establishing the flooring work area on a host site - access, laydown of materials and machines, area isolation, induction, temporary power, and setting out the works.
Establishing the formwork work area including induction, laydown set-up, services check and setting out the structure before formwork begins.
Setting up at a home, premises or site for a garage door or gate installation - access, laydown for doors and posts, exclusion of occupants and vehicles from the opening, and setting out posts and tracks.
Setting up a gasfitting job in a home, commercial kitchen, plant room or on a site - the meter and isolation points, cylinder and tank positions, ignition control, occupants and setting out pipe routes and appliances.
Establishing the glazing work area on site - access, amenities, exclusion zones, services location and setout before glazing begins.
Establishing the work area on a client or commercial site including access, parking, amenities, signage, exclusion zones and setting out the scope before maintenance work begins.
Establishing a hoarding, temporary fencing or temporary works operation at a new site - access, induction, staging materials and plant, signage, barriers and exclusion zones before work starts.
Setting up the work area around an occupied or vacated house, establishing access, laydown and exclusion zones, and setting out stump, pier and jacking positions for house raising and restumping works.
Setting up a hydro excavation or vacuum truck job on the road reserve, a site or a plant - truck position and stability, traffic control, boom slew and spray zones, water supply, discharge point and the job plan.
Establishing the insulation work area on site including induction, access, amenities, exclusion zones and setting out the work before installation begins.
Setting up an irrigation worksite in parks, sports fields, estates and rural properties - access, public and stock exclusion, laydown for pipe and pits, plant positions and setting out mains and laterals.
Establishing the workshop or the site work area for joinery and cabinet making - amenities, power, storage of sheet goods, machine positioning and setout of the install area.
Establishing the work area in an occupied dwelling - setting up access, amenities, containment barriers and marking out the renovation scope before work begins.
Establishing the landscaping work site before construction - site access, amenities and laydown, perimeter fencing, traffic and pedestrian management, locating services, temporary power, and setting out the works.
Setting up at a lift or escalator site - landing barriers, the shaft, pit and machine room as controlled areas, laydown and hoisting positions for rails, cars and machines, and setting out brackets and landings in the shaft.
Setting a line marking job up: access and parking, laydown for paint, thermoplastic and beads, protection of the public, and setting the marking layout out.
Setting up a roofing site - roof access and edge protection before anyone goes up, crane and conveyor positions, sheet laydown, ground exclusion zones under the roof edge and overhead lines.
Establishing the site before work - access, amenities, fencing, traffic and pedestrian management, locating services, temporary power and water, and setting out the works.
Establishing a modular and prefabricated construction site - access, induction, laydown areas, crane pad and exclusion zones, signage and barriers before module delivery begins.
Establishing the painting work area including site inspection, sign-in, amenities, access, exclusion zones and signage before painting works begin.
Setting up a racking installation inside an operating warehouse: permits and induction, barricading, egress, deliveries, laydown, power and setout of the runs.
Setting up a paving site: access and laydown for pavers, sand and crushed rock, fencing, pedestrian and traffic control, locating services, power and setting out.
Arriving at a client site, inducting, assessing access and hazards, setting up the work area and signage, and staging tools and chemicals before pest management work begins.
Establishing the piling work area including induction, exclusion zones, rig working platform, laydown areas and identification of underground and overhead services.
Establishing the plastering work area including site induction, amenities, material staging, exclusion zones and setting out the works.
Setting up the work area, establishing access, laydown and exclusion zones, and setting out levels and lines for playground construction works.
Establishing the plumbing work site before work begins - access, amenities and laydown, perimeter fencing and hoarding, traffic and pedestrian management, locating services, temporary power and water connections, and setting out the works.
Establishing the work area for power tool and equipment work - site inspection, induction, amenities, exclusion and signage, and setting out the work before tools are used.
Setting up a powerline worksite on the road reserve, easement or private land - vehicle and plant positions, traffic control, exclusion zones under the line, laydown for poles and drums, and setting out pole and pit positions.
Setting up a precast or tilt-up erection site - crane standing areas, panel delivery and laydown, brace footing zones, exclusion zones and access - and setting out panel, footing and brace positions.
Establishing a pressure cleaning and sealing operation at a new site - access, induction, staging equipment and chemicals, signage, barriers and exclusion zones before work starts.
Setting up a rendering site: access to the elevation, laydown for render, coatings and boards, water and power, protection of the building and the public, and setting out.
Establishment of site facilities - fencing, hoarding, amenities, service connections, signage and setout - before works commence.
Establishing a restoration and make-safe response at a new site - structural assessment, access, induction, staging equipment and chemicals, signage, barriers and exclusion zones before work starts.
Setting up a retaining wall site - design and approvals, boundary and neighbouring structures, access for plant and deliveries, laydown for blocks, sleepers and fill, public exclusion and setting out the wall line.
Establishing the road works site including induction, implementation of the Traffic Guidance Scheme, exclusion zones, laydown areas and identification of underground and overhead services.
Establishing the work site before roofing begins - access, amenities and laydown, perimeter fencing and hoarding, traffic and pedestrian management, locating services, temporary power and water, and setting out the works.
Setting up the work area, establishing access, laydown and exclusion zones, and setting out levels and lines for rubber softfall and synthetic turf works.
Setting up the work area, establishing access, laydown and exclusion zones, and setting out levels and lines for rubber softfall works.
Mobilising to site and setting up the scaffolding work area including delivery, laydown, amenities, exclusion fencing & marking out scaffold lines.
Establishing a security, CCTV and alarm installation job at a new site - access, induction, staging equipment, signage, barriers and exclusion zones before work starts.
Setting up the work area, establishing access, laydown and exclusion zones, and setting out levels and lines for shade sail and shade structure works.
Establishing a shed or rural building site - access, setout on paddock sites, amenities, fencing, temporary power and water, and locating services before work starts.
Setting up at a shopfront, building, roadside or client premises for sign installation - access, exclusion zones under the work, pedestrian and traffic interfaces, laydown for panels and access equipment.
Establishing the steel construction work area - access, laydown, amenities, exclusion fencing and setout of footings and grid lines.
Establishing the steel fixing work area including induction, services identification, laydown, amenities, exclusion fencing and dimensional setout.
Establishing the stonemasonry work area including induction, exclusion zones, laydown and A-frame storage areas, delivery routes and services identification.
Establishing the pool site before construction - access, amenities and laydown, perimeter fencing, locating services, temporary power and water, and setting out the pool shell footprint.
Setting up the work area, establishing access, laydown and exclusion zones, and setting out levels and lines for synthetic turf works.
Establishing the work area, amenities and access, and setting out tiling and waterproofing works before the job begins.
Setting up a timber flooring job: access, laydown for packs, machines and chemicals, power, ventilation, protection of the building, and setting out the work.
Mobilising plant, vehicles and materials to a traffic management site, establishing laydown and amenities, and setting out the works against the approved scheme.
Establishing the depot, yard or delivery work site before operations - access, amenities and laydown, perimeter fencing and traffic and pedestrian management, locating services, temporary power and water, and setting out the works.
Establishing the depot or customer work area for waste and skip bin operations - site walk, layout, vehicle movement areas, signage and barriers, services and emergency preparedness.
Establishing the waterproofing work area including induction, exclusion zones, laydown, chemical storage and services identification.
Establishing the work area including site inspection, induction, amenities, access, exclusion zones and marking out before fabrication or installation work begins.
Setting up a film job: access to the glazing, laydown for film and chemicals, water and power, protection of the building and the public, and setting out the openings.
Establishing the work site before construction - access, amenities and laydown, perimeter fencing and hoarding, traffic and pedestrian management, locating services, temporary power and water, and setting out the works.
Your state
GST-inclusive. Instant download. Tax invoice provided.
Need a safety document we don’t have?
Our catalogue covers 105 trades, but not every job fits one. If a principal contractor has asked for something specific, or the work you do is not in the list, we write it from scratch for your trade and your state. Same format as everything else here: editable Word, your state's Act and regulator, ready to put your details on. We can also brand your SWMS pack with your logo and company details. We’ll write it for you →