Rough-in & Final Fit-out Plumbing SWMS
Plumbing rough-in and final fit-out: pipework, fixtures and connections.
SWMS templates. Editable Word documents, written for your state, ready to adapt to the job.
There are 2 versions of this SWMS
The hazards, controls and task steps in each one are written around the work that trade actually does. Pick the closest match to your work, then your state.
What this version covers
Rough-in and final fit-out plumbing in kitchens and bathrooms, including cutting into water and gas lines, brazing and soldering, fixture installation and pressure testing.
Objective
Complete the work safely by controlling hot work fire and fume, confined under-sink and wall-cavity work, struck services and manual handling through isolation, ventilation, hot work controls and team lifts.
Full details for this version →All 2 versions
Rough-in and final fit-out plumbing in kitchens and bathrooms, including cutting into water and gas lines, brazing and soldering, fixture installation and pressure testing.
Plumbing rough-in and fit-off during construction including in-wall and in-slab pipework, fixtures, brazing and commissioning.
Your state
GST-inclusive. Instant download. Tax invoice provided.
Need a safety document we don’t have?
Our catalogue covers 105 trades, but not every job fits one. If a principal contractor has asked for something specific, or the work you do is not in the list, we write it from scratch for your trade and your state. Same format as everything else here: editable Word, your state's Act and regulator, ready to put your details on. We can also brand your SWMS pack with your logo and company details. We’ll write it for you →