Rough-in & Final Fit-out Plumbing (Kitchen Bathroom and Renovation)
Rough-in and final fit-out plumbing in kitchens and bathrooms, including cutting into water and gas lines, brazing and soldering, fixture installation and pressure testing.
Objective
Complete the work safely by controlling hot work fire and fume, confined under-sink and wall-cavity work, struck services and manual handling through isolation, ventilation, hot work controls and team lifts.
This is the Kitchen Bathroom and Renovation version. The hazards and controls are written around kitchen bathroom and renovation work, so it differs from the other 1 trade versions of Rough-in & Final Fit-out Plumbing. Compare all 2.
Built by WHS professionals, written for your state
Every document is built by WHS professionals. Each state version references the Act, regulator, and requirements for the state you select. Victoria gets the OHS Act and WorkSafe Victoria, NSW gets the WHS Act and SafeWork NSW.
Included in 1 Trade Pack
When you'd use this SWMS
If rough-in & final fit-out plumbing (kitchen bathroom and renovation) is part of your job, the builder or head contractor will usually want a SWMS for it before you start on site. This one's editable in Word. Add your company and site details, check the hazards and controls against the actual job, and get your crew to sign on before work starts.
Doing the whole trade? The Kitchen Bathroom and Renovation pack bundles this with the rest and works out cheaper. New to it? Here's what goes in a SWMS.
Related SWMS
Select your state to purchase
GST-inclusive. Instant download. Tax invoice provided.
Last review: 9 August 2026
Need help making the SWMS yours?
We can add your logo, company name, and business details to your SWMS pack. Email us for a quote.