Roofing Removal SWMS

Removal of existing roof cladding (sheet or tile) and battens, including fragile and ACM roof identification, work at height, debris handling and weatherproofing.

SWMS templates. Editable Word documents, written for your state, ready to adapt to the job.

There are 2 versions of this SWMS

The hazards, controls and task steps in each one are written around the work that trade actually does. Pick the closest match to your work, then your state.

What this version covers

Removal of existing roof cladding (sheet or tile) and battens, including fragile and asbestos-containing material (ACM) roof identification, work at height and debris handling.

Objective

Complete the work safely by controlling falls from and through the roof, dropped sheets and asbestos cement, through roof assessment and edge protection, crawl boards and exclusion zones, and licensed ACM removal.

Full details for this version →
$49.99/state

Your state

Get the whole trade pack

GST-inclusive. Instant download. Tax invoice provided.

Need a safety document we don’t have?

Our catalogue covers 105 trades, but not every job fits one. If a principal contractor has asked for something specific, or the work you do is not in the list, we write it from scratch for your trade and your state. Same format as everything else here: editable Word, your state's Act and regulator, ready to put your details on. We can also brand your SWMS pack with your logo and company details. We’ll write it for you →