Retaining Walls SWMS
Constructing retaining walls: block, timber, stone and segmental systems, including footings, drainage and backfill.
There are 3 versions of this SWMS
The hazards, controls and task steps in each one are written around the work that trade actually does. Pick the closest match to your work, then your state.
What this version covers
Construction of block, panel, sleeper and boulder retaining walls including excavation, footings, drainage, wall construction and backfill.
Objective
Complete the work safely by controlling excavation collapse, service strikes and crush injuries from heavy units through battering or shoring, Dial Before You Dig, mechanical handling and exclusion zones.
Full details for this version →All 3 versions
Construction of block, panel, sleeper and boulder retaining walls including excavation, footings, drainage, wall construction and backfill.
Construction of retaining walls (block, sleeper, concrete or panel, masonry, gabion and mass/crib) including engineered design, excavation of the cut, footings, unit placement, drainage and backfill.
Construction of retaining walls (block, sleeper, concrete/panel, masonry, gabion and similar) including engineered design, excavation of the cut, footings, unit placement, drainage and backfill.
Your state
GST-inclusive. Instant download. Tax invoice provided.
Need help making the SWMS yours?
We can add your logo, company name, and business details to your SWMS pack. Email us for a quote.