Painting Asbestos Roofs SWMS
Preparation and coating/encapsulation of asbestos-cement roofs - the roof is coated in place, never abraded or pressure-washed.
SWMS templates. Editable Word documents, written for your state, ready to adapt to the job.
There are 3 versions of this SWMS
The hazards, controls and task steps in each one are written around the work that trade actually does. Pick the closest match to your work, then your state.
What this version covers
Preparation and coating/encapsulation of asbestos-cement roofs in place, where the roof is never abraded or pressure-washed.
Objective
Complete the work safely by controlling falls through fragile AC roofing and asbestos fibre release through encapsulation only (no abrasion or pressure cleaning), edge protection and fall arrest, and rescue capability before work starts.
Full details for this version →All 3 versions
Preparation and coating/encapsulation of asbestos-cement roofs in place, where the roof is never abraded or pressure-washed.
Low-pressure cleaning and encapsulation coating of fragile asbestos-cement roof sheeting by non-abrasive methods only, working from access equipment wherever possible.
Preparation and coating or encapsulation of asbestos-cement roofs in place, where the roof is coated by brush, roller or low-impact spray and never abraded or pressure-washed.
Your state
GST-inclusive. Instant download. Tax invoice provided.
Need a safety document we don’t have?
Our catalogue covers 105 trades, but not every job fits one. If a principal contractor has asked for something specific, or the work you do is not in the list, we write it from scratch for your trade and your state. Same format as everything else here: editable Word, your state's Act and regulator, ready to put your details on. We can also brand your SWMS pack with your logo and company details. We’ll write it for you →