Material Handling, Deliveries, Loading & Unloading SWMS
Receiving and moving deliveries of render, cement, lime, coatings, insulation board and equipment: unloading, laydown, moving to the work face and stacking.
SWMS templates. Editable Word documents, written for your state, ready to adapt to the job.
There are 9 versions of this SWMS
The hazards, controls and task steps in each one are written around the work that trade actually does. Pick the closest match to your work, then your state.
What this version covers
Receiving and moving deliveries of abrasive, coatings, hose, compressors and blast units: unloading, laydown, moving to the work face and stacking.
Objective
Control crush and struck-by during unloading, unstable stacks, load shift in transit and strain, through level laydown, exclusion zones and mechanical aids.
Full details for this version →All 9 versions
Receiving and moving deliveries of abrasive, coatings, hose, compressors and blast units: unloading, laydown, moving to the work face and stacking.
Receiving and moving deliveries of rolls, tile and plank cartons, adhesives, levelling compound and machines: unloading, laydown, moving in and stacking.
Receiving and moving deliveries of paint, thermoplastic, resin, beads, markers, wheel stops and equipment: unloading, laydown, stacking and restraint for transport.
Receiving and moving deliveries of racking and shelving components: unloading at the dock, laydown, moving into the building and stacking before erection.
Receiving and moving deliveries of paver packs, kerb units, stone, sand, cement and crushed rock: unloading, laydown, stacking and moving to the laying face.
Receiving and moving deliveries of render, cement, lime, coatings, insulation board and equipment: unloading, laydown, moving to the work face and stacking.
Receiving and moving deliveries of tile packs, ridge capping, battens, bagged cement and sand, chemicals and equipment - unloading, laydown, stacking and loading to the roof.
Receiving and moving deliveries of flooring packs, underlay, sheet subfloor, adhesives, finishes and machines: unloading, laydown and moving to the work face.
Receiving and moving deliveries of film, solution, solvents and access equipment, and working alongside glass being handled by others.
Your state
GST-inclusive. Instant download. Tax invoice provided.
Need a safety document we don’t have?
Our catalogue covers 105 trades, but not every job fits one. If a principal contractor has asked for something specific, or the work you do is not in the list, we write it from scratch for your trade and your state. Same format as everything else here: editable Word, your state's Act and regulator, ready to put your details on. We can also brand your SWMS pack with your logo and company details. We’ll write it for you →