Manual Handling (Facade and Remedial Building)
Manual handling of facade repair materials, tools and equipment including carrying loads to work fronts, suspended decks and elevated work areas.
Objective
Complete the work safely by controlling musculoskeletal injury and load instability on suspended decks through load assessment, mechanical aids, team lifting and deck load limits.
This is the Facade and Remedial Building version. The hazards and controls are written around facade and remedial building work, so it differs from the other 52 trade versions of Manual Handling. Compare all 53.
Built by WHS professionals, written for your state
Every document is built by WHS professionals. Each state version references the Act, regulator, and requirements for the state you select. Victoria gets the OHS Act and WorkSafe Victoria, NSW gets the WHS Act and SafeWork NSW.
Included in 1 Trade Pack
When you'd use this SWMS
If manual handling (facade and remedial building) is part of your job, the builder or head contractor will usually want a SWMS for it before you start on site. This one's editable in Word. Add your company and site details, check the hazards and controls against the actual job, and get your crew to sign on before work starts.
Doing the whole trade? The Facade and Remedial Building pack bundles this with the rest and works out cheaper. New to it? Here's what goes in a SWMS.
Related SWMS
Select your state to purchase
GST-inclusive. Instant download. Tax invoice provided.
Last review: 9 August 2026
Need help making the SWMS yours?
We can add your logo, company name, and business details to your SWMS pack. Email us for a quote.