Formwork
All formwork operations - decks, walls, columns, stairs and falsework, including erection, pour support, stripping and back-propping. This single SWMS covers the full formwork scope for contractors who do not require task-specific documents.
Objective
To carry out all formwork so that nobody falls from or through the deck, formwork never collapses under pour loads, and stripping happens only when the concrete and the engineer allow it.
Built by WHS professionals, written for your state
Every document is built by WHS professionals. Each state version references the Act, regulator, and requirements for the state you select. Victoria gets the OHS Act and WorkSafe Victoria, NSW gets the WHS Act and SafeWork NSW.
Included in 1 Trade Pack
When you'd use this SWMS
If formwork is part of your job, the builder or head contractor will usually want a SWMS for it before you start on site. This one's editable in Word. Add your company and site details, check the hazards and controls against the actual job, and get your crew to sign on before work starts.
Doing the whole trade? The Residential Builder pack bundles this with the rest and works out cheaper. New to it? Here's what goes in a SWMS.
Related SWMS
Select your state to purchase
GST-inclusive. Instant download. Tax invoice provided.
Last review: 9 August 2026
Need help making the SWMS yours?
We can add your logo, company name, and business details to your SWMS pack. Email us for a quote.