Erecting Fixed Scaffold SWMS

Erection, alteration and dismantling of fixed (modular/tube-and-coupler) scaffold, including base preparation, progressive erection, tying and handover.

SWMS templates. Editable Word documents, written for your state, ready to adapt to the job.

There are 4 versions of this SWMS

The hazards, controls and task steps in each one are written around the work that trade actually does. Pick the closest match to your work, then your state.

What this version covers

Erection, alteration and dismantling of fixed modular or tube-and-coupler scaffold, including base preparation, progressive erection, tying and handover.

Objective

Complete the work safely by controlling falls during erection, scaffold collapse and dropped components through licensed scaffolders, firm footings and ties, progressive guardrails and controlled lowering of components.

Full details for this version →
$49.99/state

Your state

Get the whole trade pack

GST-inclusive. Instant download. Tax invoice provided.

Need a safety document we don’t have?

Our catalogue covers 105 trades, but not every job fits one. If a principal contractor has asked for something specific, or the work you do is not in the list, we write it from scratch for your trade and your state. Same format as everything else here: editable Word, your state's Act and regulator, ready to put your details on. We can also brand your SWMS pack with your logo and company details. We’ll write it for you →