Waterproofing SOP Pack

14 Safe Operating Procedure templates: state-specific, editable

What this is

A pack of 14 Safe Operating Procedures for the plant and equipment used in waterproofing work. Each SOP is a short step-by-step for using a piece of gear safely, covering the hazards, PPE, pre-start checks, the safe method and shutdown.

They're editable Word docs, written for the state you select. If you're building a wider system, see how these documents sit inside an HSEQ or ISO system. Bonus: these SOPs come free with the Waterproofing SWMS trade pack.

The 14 SOPs included

Concrete Grinder - Scarifier
Angle Grinder
Drill - Hammer Drill
Wet-Dry Vacuum & Dust Extraction (H-Class)
Extension Leads, RCDs and Portable Power
Step Ladder - Extension Ladder
Mobile Scaffold (Tower)
Manual Handling - Team Lifting
Hazardous Substance Handling & Storage
Spill Response & Spill Kit Use
Full-Body Harness, Lanyards & Anchors - Inspection, Restraint & Rescue
LPG Torch Set (Torch-On Membrane)
Airless Sprayer (Membranes & Primers)
Injection Pump (Leak Injection)

14 SOPs

from $99.99/state

GST-inclusive. Instant download. Tax invoice provided.

Last review: 22 August 2026

Need a safety document we don’t have?

Our catalogue covers 105 trades, but not every job fits one. If a principal contractor has asked for something specific, or the work you do is not in the list, we write it from scratch for your trade and your state. Same format as everything else here: editable Word, your state's Act and regulator, ready to put your details on. We can also brand your SOP pack with your logo and company details. We’ll write it for you →