Retaining Wall Construction SOP Pack

23 Safe Operating Procedure templates: state-specific, editable

What this is

A pack of 23 Safe Operating Procedures for the plant and equipment used in retaining wall construction work. Each SOP is a short step-by-step for using a piece of gear safely, covering the hazards, PPE, pre-start checks, the safe method and shutdown.

They're editable Word docs, written for the state you select. If you're building a wider system, see how these documents sit inside an HSEQ or ISO system. Bonus: these SOPs come free with the Retaining Wall Construction SWMS trade pack.

The 23 SOPs included

Portable Concrete Mixer
Laser Level (Line & Rotary)
Plate Compactor - Wacker
Vehicle Loading Crane (Hiab)
Angle Grinder
Circular Saw
Drill - Hammer Drill
Portable Generator
Wet-Dry Vacuum & Dust Extraction (H-Class)
Extension Leads, RCDs and Portable Power
Manual Handling - Team Lifting
Slings, Shackles and Lifting Gear
Crane Lift - Rigging (Dogging)
Hazardous Substance Handling & Storage
Fuel Storage and Refuelling
Spill Response & Spill Kit Use
Brick Saw (Wet Masonry Saw)
Mini Excavator (under 5T)
Skid Steer - Bobcat
Auger - Post-Hole Digger
Block Grab & Vacuum Block Lifter (Excavator Attachment)
Gabion Basket Assembly, Lacing & Filling Tools
Underground Service Locator (Cable & Pipe Detector)

23 SOPs

from $99.99/state

GST-inclusive. Instant download. Tax invoice provided.

Last review: 9 September 2026

Need a safety document we don’t have?

Our catalogue covers 105 trades, but not every job fits one. If a principal contractor has asked for something specific, or the work you do is not in the list, we write it from scratch for your trade and your state. Same format as everything else here: editable Word, your state's Act and regulator, ready to put your details on. We can also brand your SOP pack with your logo and company details. We’ll write it for you →