Powerline and Distribution Construction SOP Pack

23 Safe Operating Procedure templates: state-specific, editable

What this is

A pack of 23 Safe Operating Procedures for the plant and equipment used in powerline and distribution construction work. Each SOP is a short step-by-step for using a piece of gear safely, covering the hazards, PPE, pre-start checks, the safe method and shutdown.

They're editable Word docs, written for the state you select. If you're building a wider system, see how these documents sit inside an HSEQ or ISO system. Bonus: these SOPs come free with the Powerline and Distribution Construction SWMS trade pack.

The 23 SOPs included

Traffic Control Sign & Cone Setout
Vehicle Loading Crane (Hiab)
Cable Hauling Winch, Rods, Rollers & Drum Stands
Hydraulic Crimper & Cable Cutter
Portable Generator
Extension Leads, RCDs and Portable Power
Step Ladder - Extension Ladder
Elevated Work Platform (EWP) - Boom Lift
Manual Handling - Team Lifting
Slings, Shackles and Lifting Gear
Crane Lift - Rigging (Dogging)
Hazardous Substance Handling & Storage
Fuel Storage and Refuelling
Spill Response & Spill Kit Use
Mini Excavator (under 5T)
Chainsaw (Ground Use)
Pole Saw - Pole Pruner
Wood Chipper
Auger - Post-Hole Digger
Pole Top Rescue Kit & Controlled Descent Device
Insulated Sticks, Gloves & Cover-Up - Inspection, Test & Use
Cable Stringing Tensioner, Puller and Reel Stands
Underground Service Locator (Cable & Pipe Detector)

23 SOPs

from $99.99/state

GST-inclusive. Instant download. Tax invoice provided.

Last review: 9 September 2026

Need a safety document we don’t have?

Our catalogue covers 105 trades, but not every job fits one. If a principal contractor has asked for something specific, or the work you do is not in the list, we write it from scratch for your trade and your state. Same format as everything else here: editable Word, your state's Act and regulator, ready to put your details on. We can also brand your SOP pack with your logo and company details. We’ll write it for you →