Facade and Remedial Building SOP Pack

21 Safe Operating Procedure templates: state-specific, editable

What this is

A pack of 21 Safe Operating Procedures for the plant and equipment used in facade and remedial building work. Each SOP is a short step-by-step for using a piece of gear safely, covering the hazards, PPE, pre-start checks, the safe method and shutdown.

They're editable Word docs, written for the state you select. If you're building a wider system, see how these documents sit inside an HSEQ or ISO system. Bonus: these SOPs come free with the Facade and Remedial Building SWMS trade pack.

The 21 SOPs included

Bulk Sealant Pump & Powered Caulking Gun
Swing Stage (Suspended Scaffold)
Materials Hoist
Needle Gun - Scabbler
Angle Grinder
Abrasive Cut-off - Demolition Saw (Quick-Cut)
Drill - Hammer Drill
Jackhammer - Breaker
Wet-Dry Vacuum & Dust Extraction (H-Class)
Extension Leads, RCDs and Portable Power
Step Ladder - Extension Ladder
Mobile Scaffold (Tower)
Elevated Work Platform (EWP) - Scissor Lift
Elevated Work Platform (EWP) - Boom Lift
Manual Handling - Team Lifting
Chain Block - Lever Hoist
Slings, Shackles and Lifting Gear
Crane Lift - Rigging (Dogging)
Hazardous Substance Handling & Storage
Full-Body Harness, Lanyards & Anchors - Inspection, Restraint & Rescue
Injection Pump (Leak Injection)

21 SOPs

from $99.99/state

GST-inclusive. Instant download. Tax invoice provided.

Last review: 4 September 2026

Need a safety document we don’t have?

Our catalogue covers 105 trades, but not every job fits one. If a principal contractor has asked for something specific, or the work you do is not in the list, we write it from scratch for your trade and your state. Same format as everything else here: editable Word, your state's Act and regulator, ready to put your details on. We can also brand your SOP pack with your logo and company details. We’ll write it for you →