Free guide

Psychosocial hazards at work: what you need to know

Last reviewed:

Psychosocial hazards are the parts of work that can harm someone's mental health. Over the last couple of years, every state has made you manage them the same way you manage physical risks. Here's what they are and what to actually do about it.

Psychosocial hazards at work: what they are and how to manage them

What counts as a psychosocial hazard?

Safe Work Australia lists a range of them. The common ones you'll come across are:

Left alone, these can cause stress, burnout and psychological injury, and they often feed physical risks too, like fatigue leading to an incident on site.

Why do psychosocial hazards matter now?

Work health and safety laws around Australia now put a clear duty on businesses to manage psychosocial risks, not just physical ones. Most states brought in specific psychosocial regulations or codes of practice recently, and regulators are actively looking at it. In practice that means the same drill you already know: find the hazard, assess the risk, control it, and review.

What does your state require?

The duty is national but the instrument is not, and the dates differ. Every jurisdiction except Victoria works from the model WHS Regulations, where regulation 55A to 55D sets out the duty to identify psychosocial hazards and control the risk. Victoria is not in the harmonised scheme. It now has its own Occupational Health and Safety (Psychological Health) Regulations 2025, alongside the general duties in the Occupational Health and Safety Act 2004.

Check the current position with your regulator before relying on a date. This area has moved quickly and is still moving.

Is consultation a legal requirement?

Yes, and it is the part most often skipped. Work health and safety law requires a business to consult workers on matters affecting their health and safety, and psychosocial hazards are a case where consultation is not just a duty but the only practical way to find the hazard. A supervisor cannot see job demands, role conflict or a poor team culture from a desk. The people doing the work can.

In practice that means asking, through a short anonymous survey, a toolbox conversation, or a standing item at a team meeting, and then telling people what you did with the answers. Consultation that collects views and changes nothing does more harm than not asking, because it tells workers that raising something is pointless.

How do you manage psychosocial hazards?

  1. Identify. Talk to your workers and, ideally, run a short anonymous survey. They know where the pressure points are.
  2. Assess. Work out how likely each hazard is and how bad the harm could be, and record it in a register.
  3. Control. Fix it at the source where you can: realistic workloads, clear roles, proper support, and a clear, safe way for people to raise bullying or harassment. Policies and procedures back this up.
  4. Review. Check the controls are working and update them when work or the team changes.
Free Download

Start with the paperwork already drafted

We've put together a free, editable Psychosocial Hazard Pack: policy, hazard register, risk assessment worksheet, wellbeing survey, incident form and toolbox talks. Everything above, drafted and ready for you to work through.

Download the free pack

What a psychosocial risk assessment actually looks like

The same four columns as any other risk assessment, with the hazard described in terms of how work is designed rather than what a person feels.

  1. Name the hazard in work terms. Not "stress", which is the harm, but the thing causing it: "estimators carry three live tenders at once with a fixed deadline".
  2. Say who is exposed and how often. A hazard affecting two people every week is a different risk to one affecting everyone twice a year.
  3. Rate it before controls, on the same matrix you use for physical risk. Psychological injury claims run longer and cost more than most physical ones, so the consequence rating is rarely low.
  4. Control at the source first. Change the work design, the workload, the roster or the reporting line. Training and resilience programs are the bottom of the hierarchy, not the answer: they ask the worker to absorb a hazard rather than removing it.
  5. Rate the residual risk and set a review date. Review after any change to the work, the team or the leadership, and after any incident or complaint.

Where psychosocial risk shows up on a construction site

Construction carries a well-documented psychological injury problem, and the hazards are specific rather than abstract.

These sit alongside the physical controls in your WHS management system rather than in a separate document nobody opens.

What does managing psychosocial risk look like in practice?

You don't need to overthink this. Most of it is good management written down: sensible workloads, clear expectations, backing your people, and taking bullying and harassment seriously. The register and forms just give you a record that you're doing it. Start with the free pack, adapt it to your business, and review it as you go.

Start from a proper SWMS, not a blank page

State-specific, editable templates written for your state. Download instantly, then make it yours for the job and the site.

This guide is general information, not legal or safety advice, and does not guarantee compliance. Laws and site conditions vary, so always check your state regulator and have documents reviewed by a competent person.